Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 1031388.015
Citation: 01001
Citation Type: Other
Abatement Date: 08/28/2015 2
Initial Penalty: $5,390.00
Current Penalty: $3,541.80
Issuance Date: 08/04/2015
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity:
Report ID: 0418300
Contest Date:
Final Order: 08/31/2015
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/31/2015 | $3,541.80 | 08/28/2015 | Other | |
Penalty | Z: Issued | 08/04/2015 | $5,390.00 | 08/28/2015 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.36(d)(1): Employee(s) were not able to open an exit route door from the inside at all times without keys, tools, or special knowledge: (a) On or about 2/16/15 - at B3 Shipping building, the west side exit door was locked and required a key to unlock it. The exit door was not equipped with panic type hardware.