Violation Detail
Standard Cited: 19100305 G01 IV A Wiring methods, components, and equipment for general use.
Inspection Nr: 1021840.015
Citation: 01019
Citation Type: Serious
Abatement Date: 07/21/2015 3
Initial Penalty: $2,805.00
Current Penalty: $1,823.00
Issuance Date: 06/24/2015
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity: 1
Report ID: 0418100
Contest Date:
Final Order: 07/16/2015
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 07/16/2015 | $1,823.00 | 07/21/2015 | Serious | |
Penalty | Z: Issued | 06/24/2015 | $2,805.00 | Serious |
Text For Citation: 01 Item/Group: 019 Hazard:
29 CFR 1910.305(g)(1)(iv)(A): Flexible cords and/or cables were used as a substitute for the fixed wiring of a structure. On 1/28/15, at Plant 4 of the employer, electrical extension cords used to power lights at the spray booth area were used in lieu of permanent wiring. No abatement certification or documentation is required for this item.