Violation Detail
Standard Cited: 19100217 C03 VII D Mechanical power presses.
Inspection Nr: 1021840.015
Citation: 01013
Citation Type: Serious
Abatement Date: 07/21/2015 2
Initial Penalty: $7,000.00
Current Penalty: $4,550.00
Issuance Date: 06/24/2015
Nr Instances: 1
Nr Exposed: 10
Related Event Code (REC): A
Gravity: 10
Report ID: 0418100
Contest Date:
Final Order: 07/16/2015
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 07/16/2015 | $4,550.00 | 07/21/2015 | Serious | |
Penalty | Z: Issued | 06/24/2015 | $7,000.00 | 07/21/2015 | Serious |
Text For Citation: 01 Item/Group: 013 Hazard:
29 CFR 1910.217(c)(3)(vii)(d): Two hand controls used with mechanical power press(es) were not fixed in position so that only a supervisor or safety engineer was capable of relocating the controls. On 1/28/15, in Plant 4 at Press 8, the two hand control for the Press USI Clearing Part Revolution press (Press 8 - Serial #54 3167 was not in a fixed location and could be moved. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.