Violation Detail
Standard Cited: 19100217 C03 VII A Mechanical power presses.
Inspection Nr: 1021840.015
Citation: 01012B
Citation Type: Serious
Abatement Date: 08/31/2015 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 06/24/2015
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC):
Gravity: 10
Report ID: 0418100
Contest Date:
Final Order: 07/16/2015
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 07/16/2015 | $0.00 | 08/31/2015 | Serious | |
Penalty | Z: Issued | 06/24/2015 | $0.00 | 07/21/2015 | Serious |
Text For Citation: 01 Item/Group: 012B Hazard:
29 CFR 1910.217(c)(3)(vii)(a): When used in press operations requiring more than one operator, separate two hand controls were not provided for each operator. Controls were not designed to require concurrent application of all operators' controls to activate the slide. On 1/28/15, in Plant 4 at Press 2, two hand controls were not provided for all operators of the E.W. Bliss Part Revolution Press (Serial #H67849). One set of controls were provided for the press when three operators were assigned work at the press. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.