Violation Detail
Standard Cited: 19100147 C04 II The control of hazardous energy (lockout/tagout).
Inspection Nr: 1021286.015
Citation: 01003A
Citation Type: Other
Abatement Date: 07/19/2015 2
Initial Penalty: $5,000.00
Current Penalty: $2,500.00
Issuance Date: 04/02/2015
Nr Instances: 4
Nr Exposed: 10
Related Event Code (REC):
Gravity:
Report ID: 0729300
Contest Date:
Final Order: 04/27/2015
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/27/2015 | $2,500.00 | 07/19/2015 | Other | |
Penalty | Z: Issued | 04/02/2015 | $5,000.00 | 05/19/2015 | Serious |
Text For Citation: 01 Item/Group: 003A Hazard:
29 CFR 1910.147(c)(4)(ii): The procedures did not clearly and specifically outline the scope, purpose, authorization, rules, and techniques to be utilized for the control of hazardous energy, and the means to enforce compliance including, but not limited to, the following: Inside of the Production Area, gravity was not identified as an energy source in the specific procedure for the following machines: a/ Hydraulic Press Brake. b/ Standard Press Brake BR 12. c/ Mechanical Shear. d/ Hydraulic Shear.