Violation Detail
Standard Cited: 19100305 G01 IV D Wiring methods, components, and equipment for general use.
Inspection Nr: 1019426.015
Citation: 01018B
Citation Type: Serious
Abatement Date: 08/13/2015 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 07/20/2015
Nr Instances: 2
Nr Exposed: 3
Related Event Code (REC):
Gravity: 10
Report ID: 0830100
Contest Date:
Final Order: 08/11/2015
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/11/2015 | $0.00 | 08/13/2015 | Serious | |
Penalty | Z: Issued | 07/20/2015 | $0.00 | 08/13/2015 | Serious |
Text For Citation: 01 Item/Group: 018B Hazard:
29 CFR 1910.305(g)(1)(iv)(D): Flexible cords and cables were used where attached to building surfaces: a) Cabinet Shop; On or about January 22, 2015 and at times prior, employees were exposed to shock and fire hazards while using a flexible cord attached to the wall to energize the panel saw. b) Cabinet Shop; On or about January 22, 2015 and at times prior, employees were exposed to shock and fire hazards while using a flexible cord attached to the wall to energize a spot light.