Violation Detail
Standard Cited: 19100430 B04 Equipment.
Inspection Nr: 1015056.015
Citation: 01009B
Citation Type: Other
Abatement Date: 06/29/2015 2
Initial Penalty: $7,000.00
Current Penalty: $0.00
Issuance Date: 06/03/2015
Nr Instances: 2
Nr Exposed: 10
Related Event Code (REC):
Gravity:
Report ID: 0418800
Contest Date: 06/25/2015
Final Order: 01/29/2016
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 01/29/2016 | $0.00 | 06/29/2015 | Other | |
Penalty | C: Contested | 07/01/2015 | $7,000.00 | 06/29/2015 | Serious | |
Penalty | Z: Issued | 06/03/2015 | $7,000.00 | 06/29/2015 | Serious |
Text For Citation: 01 Item/Group: 009B Hazard:
29 CFR 1910.430(b)(4): The output of air compressor systems shall be tested for air purity every 6 months by means of samples taken at the connection to the distribution system, except that non-oil lubricated compressors need not be tested for oil mist, is applicable to the Construction Standard 29 CFR 1926.1090 which incorporates the General Industry Requirements: a) On or about December 18, 2014, at the jobsite, 1 East 11th Street - Slip 3, Riviera Beach, Florida 33404, the supply air of the Dive-Boss air compressor being used by the divers had not been tested for air purity every six months. b) On or about January 20, at the jobsite, 1 East 11th Street - Slip 3, Riviera Beach, Florida 33404, the supply air of the Brownie air compressor being used by the divers had not been tested for air purity every six months.