Violation Detail
Standard Cited: 19100305 J04 V Wiring methods, components, and equipment for general use.
Inspection Nr: 1010863.015
Citation: 01007
Citation Type: Serious
Abatement Date: 06/03/2015 2
Initial Penalty: $5,390.00
Current Penalty: $2,964.00
Issuance Date: 05/07/2015
Nr Instances: 2
Nr Exposed: 5
Related Event Code (REC):
Gravity: 10
Report ID: 0418400
Contest Date:
Final Order: 06/09/2015
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/09/2015 | $2,964.00 | 06/03/2015 | Serious | |
Penalty | Z: Issued | 05/07/2015 | $5,390.00 | 06/03/2015 | Serious |
Text For Citation: 01 Item/Group: 007 Hazard:
29 CFR 1910.305(j)(4)(v): The disconnecting means was not readily accessible: a) At the recycling facility in Unadilla, GA: On or about August 5, 2014 and November 12, 2014, and at times prior thereto, the employer exposed employees to hazards not limited to fire and amputations, in that an energized 240/110 VAC pull box for the shredder was blocked by excessive debris as employees used it for emergency-motor shutdown and maintenance.