Violation Detail
Standard Cited: 19100303 G01 General.
Inspection Nr: 1010323.015
Citation: 01019
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $1,600.00
Current Penalty: $800.00
Issuance Date: 05/21/2015
Nr Instances: 3
Nr Exposed: 3
Related Event Code (REC):
Gravity: 5
Report ID: 0112000
Contest Date:
Final Order: 06/18/2015
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/18/2015 | $800.00 | Serious | ||
Penalty | Z: Issued | 05/21/2015 | $1,600.00 | Serious |
Text For Citation: 01 Item/Group: 019 Hazard:
29 CFR 1910.303(g)(1): Sufficient access and working space was not provided and maintained about all electric equipment (operating at 600 volts, nominal, or less to ground) to permit ready and safe operation and maintenance of such equipment: On, December 1, 2014, in the following locations, adequate working space was not provided in front of panelboards: A. Side Room, Front of Shop: The Kuang Yung gang saw, Model MR5-200, was installed in front of a 120/240 volt General Electric panelboard that energized a shaper, bench outlets and transformers. B. Back Shop: A Friedrich Zimmerman horizontal lathe was stored in front of the Murray 208 volt, three phase circuit breaker panel that energized the sander and tenoner. C. Compressor Room: The compressor for shop air was installed in front of a wall mounted circuit breaker that energized lights, receptacles and the compressor