Standard Cited: 19100303 C03 I General.
Inspection Nr: 1009754.015
Citation: 02001
Citation Type: Other
Abatement Date: 06/01/2015 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 05/19/2015
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity:
Report ID: 0418800
Contest Date:
Final Order: 06/09/2015
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/09/2015 | $0.00 | 06/01/2015 | Other | |
Penalty | Z: Issued | 05/19/2015 | $0.00 | 06/01/2015 | Other |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1910.303(c)(3)(i): All splices and joints and the free ends of the conductors were not covered with an insulation equivalent to that of the conductors or with an insulating device identified for the purpose. a.) On or about April 8, 2015, at the above addressed job site, employees were exposed to shock and electrocution while using the Dayton pedestal fan that had a spliced 110 VAC electrical power cord.