Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1009754.015
Citation: 01003
Citation Type: Serious
Abatement Date: 06/01/2015 2
Initial Penalty: $6,300.00
Current Penalty: $3,150.00
Issuance Date: 05/19/2015
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC):
Gravity: 10
Report ID: 0418800
Contest Date:
Final Order: 06/09/2015
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/09/2015 | $3,150.00 | 06/01/2015 | Serious | |
Penalty | Z: Issued | 05/19/2015 | $6,300.00 | 06/01/2015 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: a.) On or about January 7, 2015, at the above addressed jobsite, the employer did not conduct a periodic inspection at least annually to ensure that the energy control procedures and the requirements of this standard were being followed to secure two baling machines which were being maintained by employees who had not de energized and locked the electrical disconnect panel.