Violation Detail
Standard Cited: 19100219 B01 Mechanical power-transmission apparatus.
Inspection Nr: 1009711.015
Citation: 01019
Citation Type: Serious
Abatement Date: 05/04/2015 2
Initial Penalty: $4,200.00
Current Penalty: $2,100.00
Issuance Date: 04/08/2015
Nr Instances: 1
Nr Exposed: 22
Related Event Code (REC):
Gravity: 5
Report ID: 0522300
Contest Date: 05/01/2015
Final Order: 12/21/2015
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 12/21/2015 | $2,100.00 | 05/04/2015 | Serious | |
Penalty | C: Contested | 05/05/2015 | $4,200.00 | 05/04/2015 | Serious | |
Penalty | Z: Issued | 04/08/2015 | $4,200.00 | 05/04/2015 | Serious |
Text For Citation: 01 Item/Group: 019 Hazard:
29 CFR 1910.219(b)(1): Flywheel(s) with parts seven feet or less above floor(s) or platform(s) were not guarded in accordance with the requirements specified in 29 CFR 1910.219(b)(1)(i) through (b)(1)(iv)(a): The National Max press (company #2084) located in bay 5, did not have the inner flywheel guarded by a full enclosure. Operators and other employees, who access the area, were not protected from hazards created by the unguarded flywheel assembly, which measured approximately 4 ft. 8 inch from the unit to ground level.