Violation Detail
Standard Cited: 19100179 J02 III Overhead and gantry cranes.
Inspection Nr: 1009711.015
Citation: 01008B
Citation Type: Serious
Abatement Date: 05/04/2015 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 04/08/2015
Nr Instances: 2
Nr Exposed: 30
Related Event Code (REC):
Gravity: 5
Report ID: 0522300
Contest Date: 05/01/2015
Final Order: 12/21/2015
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 12/21/2015 | $0.00 | 05/04/2015 | Serious | |
Penalty | C: Contested | 05/05/2015 | $0.00 | 05/04/2015 | Serious | |
Penalty | Z: Issued | 04/08/2015 | $0.00 | 05/04/2015 | Serious |
Text For Citation: 01 Item/Group: 008B Hazard:
29 CFR 1910.179(j)(2)(iii): Monthly inspections of hooks, with a certification record which includes the date of inspection, the signature of the person who performed the inspection and the serial number, or other identifier, of the hook inspected, were not performed: a. On or about 11/19/2014, the employer failed to ensure certified hook inspections were performed and documented for the #18 crane located in bay 5. b. On or about 11/19/2014, the employer failed to ensure certified hook inspections were performed and documented for the #8 crane located in bay 3.