Violation Detail
Standard Cited: 19100217 C01 I Mechanical power presses.
Inspection Nr: 1003600.015
Citation: 02011
Citation Type: Serious
Abatement Date: 05/13/2015 2
Initial Penalty: $6,300.00
Current Penalty: $4,095.00
Issuance Date: 03/27/2015
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 10
Report ID: 0112000
Contest Date:
Final Order: 04/27/2015
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/27/2015 | $4,095.00 | 05/13/2015 | Serious | |
Penalty | Z: Issued | 03/27/2015 | $6,300.00 | 05/13/2015 | Serious |
Text For Citation: 02 Item/Group: 011 Hazard:
29 CFR 1910.217(c)(1)(i): The employer did not provide and ensure the usage of point of operation guards or properly applied point of operation devices on every operation performed on mechanical power press(es): Tool Room: On, or about, November 19, 2014, point of operation safeguarding was not provided on Machine #2516, a V&O full revolution mechanical power press.