Violation Detail
Standard Cited: 19100124 J02 I
Inspection Nr: 1003600.015
Citation: 02004B
Citation Type: Serious
Abatement Date: 05/13/2015 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 03/27/2015
Nr Instances: 3
Nr Exposed: 10
Related Event Code (REC):
Gravity: 5
Report ID: 0112000
Contest Date:
Final Order: 04/27/2015
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/27/2015 | $0.00 | 05/13/2015 | Serious | |
Penalty | Z: Issued | 03/27/2015 | $0.00 | 05/13/2015 | Serious |
Text For Citation: 02 Item/Group: 004B Hazard:
29 CFR 1910.124(j)(2)(i): The employer did not ensure airflow was adequate at least quarterly during operation: On, or about, October 24, 2014, the company had not developed and implemented a quarterly inspection program to ensure adequate airflow in the ventilation systems provided for the following dipping and coating operations: A. Etch Room: 1. Chem Etch. 2. Anodize Etch. B. Comparator Area: Crystal Clean solvent tank.