Violation Detail
Standard Cited: 19100037 A03 Maintenance, safeguards, and operational features for exit routes.
Inspection Nr: 1003600.015
Citation: 02002
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $2,700.00
Current Penalty: $1,755.00
Issuance Date: 03/27/2015
Nr Instances: 1
Nr Exposed: 10
Related Event Code (REC):
Gravity: 1
Report ID: 0112000
Contest Date:
Final Order: 04/27/2015
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/27/2015 | $1,755.00 | Serious | ||
Penalty | Z: Issued | 03/27/2015 | $2,700.00 | Serious |
Text For Citation: 02 Item/Group: 002 Hazard:
29 CFR 1910.37(a)(3): Exit access went through a room that could be locked, such as a bathroom, to reach an exit or exit discharge, or may it lead into a dead-end corridor: Front of building, near Validation Room: On, or about, October 21, 2014, a dead-end corridor was located in the path the exit door located at the front of the plant area. The corridor led to an abandoned front office and the door to the office was normally left locked.