Violation Detail
Standard Cited: 19100269 O06 II Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1003042.015
Citation: 01004
Citation Type: Serious
Abatement Date: 11/30/2015 2
Initial Penalty: $7,000.00
Current Penalty: $7,000.00
Issuance Date: 04/10/2015
Nr Instances: 2
Nr Exposed: 3
Related Event Code (REC):
Gravity: 10
Report ID: 0419700
Contest Date:
Final Order: 05/07/2015
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 05/07/2015 | $7,000.00 | 11/30/2015 | Serious | |
Penalty | Z: Issued | 04/10/2015 | $7,000.00 | 04/22/2015 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.269(o)(6)(ii): The test operator in charge did not conduct routine safety checks before each series of tests to ensure required safety conditions: a. On or about October 13, 2014 at the Reddick Substation, during Doble Testing, the Test Operator and the Person-in-charge did not conduct routine safety checks before each test series including, but not limited to verifying that required personal protective equipment was in use near the Doble test set leads, transformer bushings, and terminal jumper wires, exposing employees to a 10 kilovolt, 300 milliamp electrocution hazard. b. On or about October 15, 2014 at the Reddick Substation, during Doble Testing, the Test Operator and the Person-in-charge did not conduct routine safety checks before each test series including, but not limited to verify that required personal protective equipment was in use near the Doble test set leads, transformer bushings, and terminal jumper wires, exposing employees to a 10 kilovolt, 300 milliamp electrocution hazard.