Violation Detail

Standard Cited: 19100179 J02 III Overhead and gantry cranes.

Inspection Nr: 1354960.015

Citation: 02002

Citation Type: Other

Abatement Status: Abatement Completed

Initial Penalty: $0.00

Current Penalty: $0.00

Issuance Date: 03/07/2019

Nr Instances: 1

Nr Exposed: 5

Abatement Date: 04/02/2019

Gravity:

Report ID: 0213900

Contest Date:

Final Order: 04/05/2019

Related Event Code (REC):

Emphasis:


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty I: Informal Settlement 04/05/2019 $0.00 04/02/2019 Other  
Penalty Z: Issued 03/07/2019 $0.00 04/02/2019 Other  

Text For Citation: 02 Item/Group: 002 Hazard:

29 CFR 1910.179(j)(2)(iii): Monthly inspections of hooks, with a certification record which includes the date of inspection, the signature of the person who performed the inspection and the serial number, or other identifier, of the hook inspected, were not performed: a) Northeast Precast LLC.- Throughout the manufacturing area: The employer did not conduct a monthly inspection of the hooks with the required written certification on the 1 P&H 5 Ton crane, 2 P&H 5 Ton crane, DEMAG 20 Ton crane, etc. However the employer conducted a visual inspection on the cranes every three months, no written certification was done. on or about 10/03/2018.

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.