Standard Cited: 19100119 D03 II Process safety management of highly hazardous chemicals.

Inspection Nr: 1010442.015

Citation: 01006D

Citation Type: Serious

Abatement Status: Abatement Completed

Initial Penalty: $2,800.00

Current Penalty: $0.00

Issuance Date: 04/01/2015

Nr Instances: 2

Nr Exposed: 10

Abatement Date: 06/06/2016

Gravity: 10

Report ID: 0213100

Contest Date: 04/23/2015

Final Order: 01/06/2016

Related Event Code (REC):

Emphasis:


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty J: ALJ Decision 01/06/2016 $0.00 06/06/2016 Serious  
Penalty C: Contested 05/07/2015 $2,800.00 05/06/2015 Serious  
Penalty Z: Issued 04/01/2015 $2,800.00 05/06/2015 Serious  

Text For Citation: 01 Item/Group: 006D Hazard:

29 CFR 1910.119(d)(3)(ii): The employer did not document that equipment complied with recognized and generally accepted good engineering practices: a) On or about October 3, 2014, at the facility, for employees manufacturing phenol-formaldehyde resins and casting the resin into custom sized balls. The faceplate identifying the manufacturer, the vessel, and design specifications was missing. The faceplate is required to be present on the vessel as required under such as, but not limited to API 620-2008, "Design and Construction of Large, Welded, Low-Pressure Storage Tanks, section 1.1. (b) On or about October 3, 2014, at the facility, kettle #3 and kettle #4 was designed and built as a pressure vessel by the manufacturer. They were modified after manufacturing and hydrostatic testing to operate under vacuum pressure in this production process. The employer did not subject the vessels to pressure and vacuum testing after this alteration as required under such as, but not limited to API 572-2009, "Inspection Practices for Pressure Vessels," section 9.7.2. (c) On or about October 3, 2014, at the facility, for employees manufacturing phenol-formaldehyde resins and casting resin into custom sized balls. The steam and vacuum piping including valves throughout the processing equipment were not labeled as to their identity and the direction of flow using the requirements outlined in such as, but not limited to ASME A13.1-2007, "Scheme for the Identification of Piping Systems". (d) On or about October 3, at this facility, for employees manufacturing phenol-formaldehyde resins and casting resin into custom sized balls. Kettles #3 and #4 were not equipped with safe valves to relieve pressure, if over pressurization occurred in these low pressure reactors during this exothermic reaction. The requirement to install pressure-relieving valves and emergency vacuum-reliving valves is covered under the requirements outlined in such as, but not limited to API Standard 620-2008, " Design and Construction of Large, Welded, Low Pressure Storage Tanks," section

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.