Powered by GoogleTranslate

Violation Detail

Standard Cited: 19100147 D02 The control of hazardous energy (lockout/tagout).

Inspection Nr: 1342021.015

Citation: 01006B

Citation Type: Serious

Abatement Status: Abatement Completed

Initial Penalty: $11,641.00

Current Penalty: $0.00

Issuance Date: 01/22/2019

Nr Instances: 1

Nr Exposed: 11

Abatement Date: 04/11/2019

Gravity: 10

Report ID: 0626700

Contest Date:

Final Order: 02/07/2019

Related Event Code (REC): A

Emphasis:


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty I: Informal Settlement 02/07/2019 $0.00 04/11/2019 Serious  
Penalty Z: Issued 01/22/2019 $11,641.00 03/11/2019 Serious  

Text For Citation: 01 Item/Group: 006B Hazard:

29 CFR 1910.147(d)(2): An orderly shutdown of machine or equipment was not utilized to avoid any additional or increased hazards to employees as a result of equipment stoppage: a) At the facility, furnace area: On or about August 25, 2018, 1 Mega Watt arc furnaces were not de-energized when employees performed service and maintenance tasks such as but not limited to threading new lengths of electrodes. This condition exposed employees to an electrocution hazard.

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.

Close