Standard Cited: 19260502 J01 Fall protection systems criteria and practices.
Inspection Nr: 1293737.015
Citation: 01004D
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $5,174.00
Current Penalty: $0.00
Issuance Date: 02/26/2018
Nr Instances: 4
Nr Exposed: 4
Abatement Date: 03/06/2018
Gravity: 10
Report ID: 0111400
Contest Date: 03/22/2018
Final Order: 07/06/2018
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 07/06/2018 | $0.00 | 03/06/2018 | Serious | |
| Penalty | C: Contested | 04/02/2018 | $5,174.00 | 03/06/2018 | Serious | |
| Penalty | Z: Issued | 02/26/2018 | $5,174.00 | 03/06/2018 | Serious |
Text For Citation: 01 Item/Group: 004D Hazard:
29 CFR 1926.502(j)(1): Toeboards were not erected along the edge of the overhead walking/working surface for a distance sufficient to protect employees below: Location: 4 Winthrop Street, East Boston, MA On or about February 6, 2017, employees were exposed to struck by hazards, from falling debris and construction equipment, where toeboards had not been installed.