Powered by GoogleTranslate

Violation Detail

Standard Cited: 19100119 J04 I Process safety management of highly hazardous chemicals.

Inspection Nr: 1130977.015

Citation: 01004B

Citation Type: Serious

Abatement Status: Abatement Completed

Initial Penalty: $7,000.00

Current Penalty: $0.00

Issuance Date: 07/28/2016

Nr Instances: 2

Nr Exposed: 350

Abatement Date: 02/13/2017

Gravity: 10

Report ID: 0112600

Contest Date:

Final Order: 08/24/2016

Related Event Code (REC):

Emphasis:

Substance: 2150


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty P: Petition to Mod Abatement $0.00 02/13/2017 Serious  
Penalty I: Informal Settlement 08/24/2016 $0.00 12/12/2016 Serious  
Penalty Z: Issued 07/28/2016 $7,000.00 12/12/2016 Serious  

Text For Citation: 01 Item/Group: 004B Hazard:

29 CFR 1910.119(j)(4)(i): The employer did not perform inspection and tests on process equipment: a) In the propane storage area and heat treat department at 106 Lonczak Drive Chicopee, MA: On or about April 15, 2016, the employer did not perform inspection and tests to maintain the on-going integrity of the polyethylene piping between the propane storage tank and facility exterior. Abatement Note: One feasible means of abatement would be to conduct piping inspections based on, or consistent with, National Board Inspection Code (NBIC), Part 2, Inspection (2013 Edition). b) The metallic piping supplying propane to the heat treat furnaces and the flexible hose in the propane distribution area for the two banks of rotary furnaces. On or about April 15, 2016, the employer did not perform inspection and tests to maintain the on-going integrity metallic piping supplying propane to the various heat treat furnaces or the flexible hose in the propane distribution area for the two banks of rotary furnaces. Abatement Note: One feasible means of abatement would be to conduct piping inspections per the employer's mechanical integrity procedures for piping integrity inspections and testing that are based on, or consistent with, API 570 (2016 - 4th Edition), Piping Inspection Code: In-Service Inspection, Rating, Repair, and Alteration of Piping Systems, and API 574 (2016 - 4th Edition), Inspection Practices for Piping System Components. These mechanical inspection procedures would include, but not be limited to, the maximum inspection intervals of piping systems designated as Class 2 (hydrogen, fuel gas, and natural gas): visual external every five years and thickness measurements every ten years.

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.