Violation Detail

Standard Cited: 19261203 E02 V A  

Inspection Nr: 1414056.015

Citation: 01002C

Citation Type: Serious

Abatement Status: Abatement Completed

Initial Penalty: $0.00

Current Penalty: $0.00

Issuance Date: 01/07/2020

Nr Instances: 1

Nr Exposed: 3

Abatement Date: 02/03/2020

Gravity: 10

Report ID: 0418400

Contest Date:

Final Order: 02/06/2020

Related Event Code (REC):

Emphasis:

Substance: X100


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty I: Informal Settlement 02/06/2020 $0.00 02/03/2020 Serious  
Penalty Z: Issued 01/07/2020 $0.00 02/03/2020 Serious  

Text For Citation: 01 Item/Group: 002C Hazard:

29 CFR 1926.1203(e)(2)(v)(A): Continuous forced air ventilation was not used when an employee entered a space and until a hazardous atmosphere had been eliminated: (a) At the construction site on Belfast Keller and Interstate I-95, on or about July 8, 2019, the employer did not ensure that forced air ventilation was used inside an underground water main vault before employees entered the space, exposing employees to an oxygen deficient atmosphere.

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.