Standard Cited: 19100147 D The control of hazardous energy (lockout/tagout).

Inspection Nr: 1170976.015

Citation: 01002

Citation Type: Serious

Abatement Status: Abatement Completed

Initial Penalty: $12,471.00

Current Penalty: $12,471.00

Issuance Date: 12/05/2016

Nr Instances: 2

Nr Exposed: 2

Abatement Date: 12/30/2016

Gravity: 10

Report ID: 0524200

Contest Date:

Final Order: 12/30/2016

Related Event Code (REC): R

Emphasis:


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty I: Informal Settlement 12/30/2016 $12,471.00 12/30/2016 Serious  
Penalty Z: Issued 12/05/2016 $12,471.00 12/30/2016 Serious  

Text For Citation: 01 Item/Group: 002 Hazard:

29 CFR 1910.147(d): The established procedure for the application of energy control (the lockout or tagout procedures) did not cover the actions listed in and was not done in sequence as required by 29 CFR 1910.147(d)(1)-(6): a) JBC Line - On or about August 17, 2016, an employee was exposed to machine hazards associated with moving parts while unclogging dough from the No. 4 cyclone receiver. The employer failed to implement energy control application steps as the machine was not shut down and locked out to perform the servicing work [per the 1910.147(d)(2) requirements]. As a result, the remaining applicable energy control elements, involving machine isolation [(d)(3)], LOTO device application [(d)(4)], dissipation of residual energy [(d)(5)], and verification of isolation [(d)(6)], were not implemented to protect the employee from machine servicing hazards. b) Bakery Line - On or about September 27, 2016, an employee was exposed to machine hazards associated with moving parts while cleaning dough from the mixing blades on Dough Chunker #1. The employer failed to implement energy control application steps as the machine was not shut down and locked out to perform the servicing work [per the 1910.147(d)(2) requirements]. As a result, the remaining applicable energy control elements, involving machine isolation [(d)(3)], LOTO device application [(d)(4)], dissipation of residual energy [(d)(5)], and verification of isolation [(d)(6)], were not implemented to protect the employee from machine servicing hazards.

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.