Standard Cited: 5A0001 OSH Act General Duty Paragraph

Inspection Nr: 912440.015

Citation: 01001

Citation Type: Serious

Abatement Status: Abatement Completed

Initial Penalty: $7,000.00

Current Penalty: $7,000.00

Issuance Date: 12/13/2013

Nr Instances: 3

Nr Exposed: 10

Abatement Date: 03/07/2014

Gravity: 10

Report ID: 0625700

Contest Date:

Final Order: 12/19/2013

Related Event Code (REC):

Emphasis:


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty I: Informal Settlement 12/19/2013 $7,000.00 03/07/2014 Serious  
Penalty Z: Issued 12/13/2013 $7,000.00 01/07/2014 Serious  

Text For Citation: 01 Item/Group: 001 Hazard:

OSH ACT of 1970 Section (5)(a)(1):The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees in the Ammonia 3 Unit of the CF Industries Complex in Donaldsonville, Louisiana were exposed to struck-by hazards while operating the Nitrogen Supply Distribution system and its attached components. Instance 1. The employer failed to ensure the adequacy of the relief system. a) Gates Terminator 3202T hoses, rated for 500 psi were installed in a system that could see pressures up to 10,000 psi. b) CETCO manifold rated for 6000 psi was installed in a system that could see pressures up to 10,000 psi. c) Speed Catalyst manifold (Texas Pneumatics Tools Model #TX-2AMF) rated for 200 psi was installed in a system that could see pressures up to 10,000 psi. d) Generant Model 4-GDR-1000-EP-C pressure regulator rated for maximum inlet pressure of 400 psi was installed in a system that could see pressures up to 10,000 psi. e) A 1" ball valve that is rated for 3600 psi was installed in a system that could see pressures up to 10,000 psi. f) Mercer 91-17D51P56E1 pressure relief valve rated for 6000 scfm of relief at 3000 psi was set to open 5000 psi and undetermined relief rate was installed in a system that could see pressures up to 10,000 psi and flow rates up to 3000 scfm. Feasible and acceptable methods of abatement of this hazard include, but are not limited to the following: 1) All pressure vessels other than unfired steam boilers shall be protected by a pressure relief device that prevent the pressure from rising more than 10% or 3 psi, whichever is greater above the maximum allowable working pressure (UG-125(c) of ASME BPVC Section VIII - Division 1). 2) The spring in a pressure relief valve shall not be set for any pressure more than 5% above or below that for which the valve is marked, unless the setting is within the spring design range established by the valve Manufacturer or is determined to be acceptable to the Manufacturer (UG-126(c) of ASME BPVC Section VIII - Division 1). 3) The aggregate capacity of the pressure relief devices connected to any vessel or system of vessels for release of a liquid, air, steam, or other vapor shall be sufficient to carry off the maximum quantity that can be generated or supplied to the attached equipment without permitting a rise in pressure within the vessel of more than 16% above the maximum allowable working pressure when the pressure relief devices are blowing (UG-133(a) of ASME BPVC Section VIII - Division 1). 4) Design the spring so that the full lift spring compression shall be no greater than 80% of the nominal solid deflection (UG-136(a)(2) of ASME BPVC Section VIII - Division 1). 5) A pressure relief device is not required if the pressure is self-limiting and less than or equal to the MAWP of the vessel at the coincident temperature. (UG-140(a) of ASME BPVC Section VIII - Division 1). 6) The design pressure of each component in a piping system shall not be less than the pressure at the most severe condition of coincident internal or external pressure and temperature (minimum or maximum) expected during service (ASME B31.3-2006 Part 1 paragraph 301.2.1(a)). 7) Adhere to industry guidance, such as but not limited to the Center for Chemical Process Safety (CCPS) 1996 Guidelines for Writing Effective Operating and Maintenance Procedures. Examples of guidance in the CCPS guidelines include: 1) Section 3.10 Procedure Training. 2) Chapter 4 - Writing Operations and Maintenance Procedures. 3) Chapter 5 - Elements of Effective Procedures Instance 2. The employer failed to ensure the adequacy of the relieving rate. a) Employer did not ensure the relief device on the CETCO nitrogen distribution manifold was adequate to relieve the delivery rate of nitrogen supplied by the nitrogen pumper unit. b) Employer did not ensure the relief device on the Speed Industrial Catalyst nitrogen distribution manifold was adequate to relieve the delivery rate of nitrogen supplied by the nitrogen pumper unit. Feasible and acceptable methods of abatement of this hazard include, but are not limited to the following: 1) All pressure vessels other than unfired steam boilers shall be protected by a pressure relief device that prevent the pressure from rising more than 10% or 3 psi, whichever is greater above the maximum allowable working pressure (UG-125(c) of ASME BPVC Section VIII - Division 1). 2) The spring in a pressure relief valve shall not be set for any pressure more than 5% above or below that for which the valve is marked, unless the setting is within the spring design range established by the valve Manufacturer or is determined to be acceptable to the Manufacturer (UG-126(c) of ASME BPVC Section VIII - Division 1). 3) The aggregate capacity of the pressure relief devices connected to any vessel or system of vessels for release of a liquid, air, steam, or other vapor shall be sufficient to carry off the maximum quantity that can be generated or supplied to the attached equipment without permitting a rise in pressure within the vessel of more than 16% above the maximum allowable working pressure when the pressure relief devices are blowing (UG-133(a) of ASME BPVC Section VIII - Division 1). 4) Design the spring so that the full lift spring compression shall be no greater than 80% of the nominal solid deflection (UG-136(a)(2) of ASME BPVC Section VIII - Division 1). 5) A pressure relief device is not required if the pressure is self-limiting and less than or equal to the MAWP of the vessel at the coincident temperature. (UG-140(a) of ASME BPVC Section VIII - Division 1). 6) The design pressure of each component in a piping system shall not be less than the pressure at the most severe condition of coincident internal or external pressure and temperature (minimum or maximum) expected during service (ASME B31.3-2006 Part 1 paragraph 301.2.1(a)). 7) Adhere to industry guidance, such as but not limited to the Center for Chemical Process Safety (CCPS) 1996 Guidelines for Writing Effective Operating and Maintenance Procedures. Examples of guidance in the CCPS guidelines include: 1) Section 3.10 Procedure Training. 2) Chapter 4 - Writing Operations and Maintenance Procedures. 3) Chapter 5 - Elements of Effective Procedures Iinstance 3. The employer failed to ensure adequate relief system control. a) 1" Ball valve between the CETCO nitrogen manifold and the Mercer pressure relief valve was not positively controlled to remain in the open position during operation. Among other methods, one feasible and acceptable method to correct this hazard is to ensute that there are no intervening stop valves between the vessel and its pressure relief device or devices, or between the pressure relief device and the point of discharge (ASME BPVC Section VIII, UG-135(d)).

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.