Violation Detail
Standard Cited: 19260850 C Preparatory operations.
This violation item has been deleted.
Inspection Nr: 1246844.015
Citation: 01001
Citation Type: Serious
Abatement Date: 09/14/2017
Initial Penalty: $9,761.00
Current Penalty: $0.00
Issuance Date: 08/25/2017
Nr Instances: 1
Nr Exposed: 6
Related Event Code (REC):
Gravity: 10
Report ID: 0627500
Contest Date:
Final Order: 09/15/2017
Emphasis:
Substance: 8870
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/15/2017 | $0.00 | 09/14/2017 | Serious | |
Penalty | Z: Issued | 08/25/2017 | $9,761.00 | 09/14/2017 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.850(c): All electric, gas, water, steam, sewer, and other service lines were not shut off, capped, and/or otherwise controlled, outside the building line before demolition work was started. On or about July 12, 2017, the employer did not ensure that all utilities were shut off, capped, and/or otherwise controlled, outside the building before demolition work was started. The electric or water utility companies were not notified in advance. This condition exposed employees to electrical shock hazards.