Violation Detail
Standard Cited: 19260451 B01 General requirements.
Inspection Nr: 913385.015
Citation: 01003
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $2,800.00
Current Penalty: $1,288.00
Issuance Date: 07/15/2013
Nr Instances: 1
Nr Exposed: 6
Related Event Code (REC):
Gravity: 10
Report ID: 0111400
Contest Date:
Final Order: 08/07/2013
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/07/2013 | $1,288.00 | Serious | ||
Penalty | Z: Issued | 07/15/2013 | $2,800.00 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds shall be fully planked or decked between the front uprights and the guardrail supports as follows: Jobsite: Mason contractor erected scaffolding on the southeast side of the project and workers had been working on a two plank work platform exposed to falls greater than 10 feet.