Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
This violation item has been deleted.
Inspection Nr: 314957416
Citation: 01002A
Citation Type: Serious
Abatement Date: 01/25/2012 X
Initial Penalty: $2,750.00
Current Penalty:
Issuance Date: 01/06/2012
Nr Instances: 1
Nr Exposed: 30
Related Event Code (REC):
Gravity:
Report ID: 0452110
Contest Date:
Final Order:
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 01/12/2012 | 01/25/2012 | Serious | ||
Penalty | Z: Issued | 01/06/2012 | $2,750.00 | 01/25/2012 | Serious |