Violation Detail
Standard Cited: 19100119 D03 IB Process safety management of highly hazardous chemicals.
Inspection Nr: 312412356
Citation: 02001
Citation Type: Other
Abatement Date: 02/20/2014 X
Initial Penalty: $8,400.00
Current Penalty: $1,500.00
Issuance Date: 04/28/2010
Nr Instances: 24
Nr Exposed: 24
Related Event Code (REC):
Gravity: 10
Report ID: 0854910
Contest Date: 05/27/2010
Final Order: 10/23/2013
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 10/23/2013 | $1,500.00 | 02/20/2014 | Other | |
Penalty | Z: Issued | 04/28/2010 | $8,400.00 | 06/03/2010 | Repeat |
Text For Citation: 02 Item/Group: 001 Hazard: REFINERY
29 CFR 1910.119(d)(3)(i)[B] Information pertaining to the equipment in the process shall include: Piping and instrument diagrams (P&ID's); A. The employer did not ensure that information pertaining to equipment in the process, specifically piping and instrument diagrams (P&ID's), was complete and accurate. This violation was identified during inspections of the facility from November 2009 to March 2010, Silver Eagle Refining Inc., 2355 South 110 West, Woods Cross, UT, 84087. On 11/19/2009, P&ID Drawings for all Process Units were requested. The employer responded by providing: i.P&IDs 03-PR-PID-0001 thru 03-PR-PID-0026 for the MDDW Unit (MDDW CSB 1DOCC4.3. 0143 thru MDDW CSB 1DOCC4.3. 0167), and ii.P&IDs 01-PR-PID-0001 thru 01-PR-PID-0031 for the #1 Crude Unit (MDDW 1- UOSH21 0001 thru MDDW 1-UOSH21 0026), and iii.P&IDs 02-PR-PID-0001 thru 02-PR-PID-0018 for the #2 Crude Unit (MDDW 1- UOSH21 0027 thru MDDW 1-UOSH21 0043), and iv.P&IDs 05-PR-PID-0001 thru 05-PR-PID-0040 for the Reformer Unit (MDDW 1- UOSH 0044 thru MDDW 1-UOSH21 0076). Documents provided as 1-UOSH-21 did not include a legend explaining all symbols used to represent valves, controls, piping fittings, etc. By not identifying current symbols on the P&ID's, employees may not be able to locate critical equipment in the field. In the event of an emergency, employees can be exposed to serious injury or death should they not be able to locate critical pieces of equipment. This may be a system-wide occurrence that requires evaluation of all piping and instrument diagrams (P&ID's) throughout the facility. Citation History: Inspection #312406986, Issued 7/09/09, Abated 8/11/09, Citation 1, Item 2. B. The employer did not ensure that information pertaining to equipment in the process, specifically piping and instrument diagrams (P&ID's), was complete and accurate. This violation was identified during inspections of the facility from November 2009 to March 2010, Silver Eagle Refining Inc., 2355 South 110 West, Woods Cross, UT, 84087. While performing field verifications, an isolation valve just downstream of PSV 39425 in the MDDW Unit was not symbolically represented on Drawing No.: 03-PR-PID-0004, (MDDW CSB 1DOC4.3 0146). In addition, the P&ID did not state that this valve was to be car- sealed open as it was downstream of a PSV that did not relieve to the atmosphere. By not maintaining complete and accurate P&ID's, in the event of an emergency, employees can be exposed to serious injury or death should they not be able to locate critical pieces of equipment. This may be a system-wide occurrence that requires evaluation of all piping and instrument diagrams (P&ID's) throughout the facility. Citation History: Inspection #312406986, Issued 7/09/09, Abated 8/11/09, Citation 1, Item 2. C. The employer did not ensure that information pertaining to equipment in the process, specifically piping and instrument diagrams (P&ID's), was complete and accurate. This violation was identified during inspections of the facility from November 2009 to March 2010, Silver Eagle Refining Inc., 2355 South 110 West, Woods Cross, UT, 84087. While performing field verifications, an isolation valve (#36092) and a check valve (#36093) upstream of PSV 39425 in the MDDW Unit were found that were symbolically misrepresented on Drawing No. 03-PR-PID-0004, (MDDW CSB 1DOC4.3 0146). The schematic configuration on the P&ID showed the gate valve upstream of the check valve. The actual arrangement was the gate valve was downstream of the check valve. By not maintaining complete and accurate P&ID's, in the event of an emergency, employees can be exposed to serious injury or death should they not be able to locate critical pieces of equipment. This may be a system-wide occurrence that requires evaluation of all piping and instrument diagrams (P&ID's) throughout the facility. Citation History: Inspection #312406986, Issued 7/09/09, Abated 8/11/09, Citation 1, Item 2. D. The employer did not ensure that information pertaining to equipment in the process, specifically piping and instrument diagrams (P&ID's), was complete and accurate. This violation was identified during inspections of the facility from November 2009 to March 2010, Silver Eagle Refining Inc., 2355 South 110 West, Woods Cross, UT, 84087. While performing field verifications, the valve tag on PSV 39412 in the MDDW Unit protecting VES-30105 was found stamped Pset = 250 psig. The same PSV is symbolically represented on Drawing No.: 03-PR-PID-0012, (MDDW CSB 1DOC4.3 0154) as having Pset = 94 psig. By not maintaining complete and accurate P&ID's, in the event of an emergency, employees can be exposed to serious injury or death should they not be able to locate critical pieces of equipment. This may be a system-wide occurrence that requires evaluation of all piping and instrument diagrams (P&ID's) throughout the facility. Citation History: Inspection #312406986, Issued 7/09/09, Abated 8/11/09, Citation 1, Item 2. E. The employer did not ensure that information pertaining to equipment in the process, specifically piping and instrument diagrams (P&ID's), was complete and accurate. This violation was identified during inspections of the facility from November 2009 to March 2010, Silver Eagle Refining Inc., 2355 South 110 West, Woods Cross, UT, 84087. While performing field verifications, an isolation valve (34567) between TWR-30101 and fin-fan cooler FAN-30201 in the MDDW Unit was reviewed. The 6" valve is approximately 25' above grade and equipped with a chain operator at grade level. The chain operator was not symbolically represented on Drawing No.: 03-PR-PID-0016, (MDDW CSB 1DOC4.3 0158). By not maintaining complete and accurate P&ID's, in the event of an emergency, employees can be exposed to serious injury or death should they not be able to locate critical pieces of equipment. This may be a system-wide occurrence that requires evaluation of all piping and instrument diagrams (P&ID's) throughout the facility. Citation History: Inspection #312406986, Issued 7/09/09, Abated 8/11/09, Citation 1, Item 2. F. The employer did not ensure that information pertaining to equipment in the process, specifically piping and instrument diagrams (P&ID's), was complete and accurate. This violation was identified during inspections of the facility from November 2009 to March 2010, Silver Eagle Refining Inc., 2355 South 110 West, Woods Cross, UT, 84087. While performing field verifications, a manually operated volume damper in the stack of Reactor Feed Heater HTR-30104 in the MDDW unit was reviewed. The stack gasses volume damper is equipped with a cable operator brought to grade level. The volume damper appears symbolically on Drawing No.: 03-PR-PID-0006, (MDDW CSB 1DOC4.3 0148) but the cable operator is not represented on the drawing. By not maintaining complete and accurate P&ID's, in the event of an emergency, employees can be exposed to serious injury or death should they not be able to locate critical pieces of equipment. This may be a system-wide occurrence that requires evaluation of all piping and instrument diagrams (P&ID's) throughout the facility. Citation History: Inspection #312406986, Issued 7/09/09, Abated 8/11/09, Citation 1, Item 2. G. The employer did not ensure that information pertaining to equipment in the process, specifically piping and instrument diagrams (P&ID's), was complete and accurate. This violation was identified during inspections of the facility from November 2009 to March 2010, Silver Eagle Refining Inc., 2355 South 110 West, Woods Cross, UT, 84087. While performing field verifications, vertical pressure vessel FIL-30103 was reviewed. This pressure vessel was symbolically represented on Drawing No. 03-PR-PID-0008 (MDDW CSB 1DOC4.3 0150). The vessel itself was identified by an adhesive label with block lettering designating it as vessel FIL-30103. In addition, the vessel was also identified as FIL-30104 by hand lettering with white paint. The P&ID did not reflect both numbers. By not maintaining complete and accurate P&ID's, in the event of an emergency, employees can be exposed to serious injury or death should they not be able to locate critical pieces of equipment. This may be a system-wide occurrence that requires evaluation of all piping and instrument diagrams (P&ID's) throughout the facility. Citation History: Inspection #312406986, Issued 7/09/09, Abated 8/11/09, Citation 1, Item 2. H. The employer did not ensure that information pertaining to equipment in the process, specifically piping and instrument diagrams (P&ID's), was complete and accurate. This violation was identified during inspections of the facility from November 2009 to March 2010, Silver Eagle Refining Inc., 2355 South 110 West, Woods Cross, UT, 84087. While performing field verifications, PSV-39406 in the MDDW Unit was reviewed. This valve was symbolically represented on Drawing No. 03-PR-PID-0008 (MDDW CSB 1DOC4.3 0150). This safety valve could not be located by tag number in the Unit. The safety valve was eventually located by following the piping for the pressure vessel it protected. The valve tag was not stamped PSV-39406. By not maintaining complete and accurate P&ID's, in theevent of an emergency, employees can be exposed to serious injury or death should they not be able to locate critical pieces of equipment. This may be a system-wide occurrence that requires evaluation of all piping and instrument diagrams (P&ID's) throughout the facility. Citation History: Inspection #312406986, Issued 7/09/09, Abated 8/11/09, Citation 1, Item 2. I. The employer did not ensure that information pertaining to equipment in the process, specifically piping and instrument diagrams (P&ID's), was complete and accurate. This violation was identified during inspections of the facility from November 2009 to March 2010, Silver Eagle Refining Inc., 2355 South 110 West, Woods Cross, UT, 84087. While performing field verifications, PSV-39407 in the MDDW Unit was reviewed. This valve was symbolically represented on Drawing No. 03-PR-PID-0008 (MDDW CSB 1DOC4.3 0150). This safety valve could not be located by tag number in the Unit. The safety valve was eventually located by following the piping for the pressure vessel it protected. The valve tag was not stamped PSV-39407. By not maintaining complete and accurate P&ID's, in the event of an emergency, employees can be exposed to serious injury or death should they not be able to locate critical pieces of equipment. This may be a system-wide occurrence that requires evaluation of all piping and instrument diagrams (P&ID's) throughout the facility. Citation History: Inspection #312406986, Issued 7/09/09, Abated 8/11/09, Citation 1, Item 2. J. The employer did not ensure that information pertaining to equipment in the process, specifically piping and instrument diagrams (P&ID's), was complete and accurate. This violation was identified during inspections of the facility from November 2009 to March 2010, Silver Eagle Refining Inc., 2355 South 110 West, Woods Cross, UT, 84087. While performing field verifications PSV-39405 in the MDDW Unit was reviewed. This valve was symbolically represented on Drawing No. 03-PR-PID-0007 (MDDW CSB 1DOC4.3 0149). This safety valve could not be located by tag number in the Unit. The safety valve was eventually located by following the piping for the pressure vessel it protected. The valve tag was not stamped PSV-39405. The valve tag was stamped with a different identification system as CRY-PSV-106. By not maintaining complete and accurate P&ID's, in the event of an emergency, employees can be exposed to serious injury or death should they not be able to locate critical pieces of equipment. This may be a system-wide occurrence that requires evaluation of all piping and instrument diagrams (P&ID's) throughout the facility. Citation History: Inspection #312406986, Issued 7/09/09, Abated 8/11/09, Citation 1, Item 2. K. The employer did not ensure that information pertaining to equipment in the process, specifically piping and instrument diagrams (P&ID's), was complete and accurate. This violation was identified during inspections of the facility from November 2009 to March 2010, Silver Eagle Refining Inc., 2355 South 110 West, Woods Cross, UT, 84087. While performing field verifications, PSV-39411 in the MDDW Unit was reviewed. This valve was symbolically represented on Drawing No. 03-PR-PID-0010 (MDDW CSB 1DOC4.3 0152). This safety valve could not be located by tag number in the Unit. The safety valve was eventually located by following the piping for the pressure vessel it protected. The valve tag was not stamped PSV-39411. The valve tag was stamped with a different identification system as TAG-PSV-105. By not maintaining complete and accurate P&ID's, in the event of an emergency, employees can be exposed to serious injury or death should they not be able to locate critical pieces of equipment. This may be a system-wide occurrence that requires evaluation of all piping and instrument diagrams (P&ID's) throughout the facility. Citation History: Inspection #312406986, Issued 7/09/09, Abated 8/11/09, Citation 1, Item 2. L. The employer did not ensure that information pertaining to equipment in the process, specifically piping and instrument diagrams (P&ID's), was complete and accurate. This violation was identified during inspections of the facility from November 2009 to March 2010, Silver Eagle Refining Inc., 2355 South 110 West, Woods Cross, UT, 84087. While performing field verifications, PSV-39413 in the MDDW Unit was reviewed. This valve was symbolically represented on Drawing No. 03-PR-PID-0012 (MDDW CSB 1DOC4.3 0154). When located, the valve bonnet had a tag identifying it as PSV-39413 while the valve body had a tag identifying it CRY-PSV-111. By not maintaining complete and accurate P&ID's, in the event of an emergency, employees can be exposed to serious injury or death should they not be able to locate critical pieces of equipment. This may be a system-wide occurrence that requires evaluation of all piping and instrument diagrams (P&ID's) throughout the facility. Citation History: Inspection #312406986, Issued 7/09/09, Abated 8/11/09, Citation 1, Item 2. M. The employer did not ensure that information pertaining to equipment in the process, specifically piping and instrument diagrams (P&ID's), was complete and accurate. This violation was identified during inspections of the facility from November 2009 to March 2010, Silver Eagle Refining Inc., 2355 South 110 West, Woods Cross, UT, 84087. While performing field verifications, PSV-39414 in the MDDW Unit was reviewed. This valve was symbolically represented on Drawing No. 03-PR-PID-0013 (MDDW CSB 1DOC4.3 0155). This safety valve could not be located by tag number in the Unit. The safety valve was eventually located by following the piping for the pressure vessel it protected. The valve tag was not stamped PSV-39414. The valve tag was stamped with a different identification system as CRY-PSV-112. By not maintaining complete and accurate P&ID's, in the event of an emergency, employees can be exposed to serious injury or death should they not be able to locate critical pieces of equipment. This may be a system-wide occurrence that requires evaluation of all piping and instrument diagrams (P&ID's) throughout the facility. Citation History: Inspection #312406986, Issued 7/09/09, Abated 8/11/09, Citation 1, Item 2. N. The employer did not ensure that information pertaining to equipment in the process, specifically piping and instrument diagrams (P&ID's), was complete and accurate. Thisviolation was identified during inspections of the facility from November 2009 to March 2010, Silver Eagle Refining Inc., 2355 South 110 West, Woods Cross, UT, 84087. While performing field verifications, PSV-39424 in the MDDW Unit was reviewed. This valve was symbolically represented on Drawing No. 03-PR-PID-0022 (MDDW CSB 1DOC4.3 0164). This safety valve could not be located by tag number in the Unit. The safety valve was eventually located by following the piping for the pressure vessel it protected. The valve tag was not stamped PSV-39424. The valve tag was stamped with a different identification system as CRY-PSV-121. By not maintaining complete and accurate P&ID's, in the event of an emergency, employees can be exposed to serious injury or death should they not be able to locate critical pieces of equipment. This may be a system-wide occurrence that requires evaluation of all piping and instrument diagrams (P&ID's) throughout the facility. Citation History: Inspection #312406986, Issued 7/09/09, Abated 8/11/09, Citation 1, Item 2. O. The employer did not ensure that information pertaining to equipment in the process, specifically piping and instrument diagrams (P&ID's), was complete and accurate. This violation was identified during inspections of the facility from November 2009 to March 2010, Silver Eagle Refining Inc., 2355 South 110 West, Woods Cross, UT, 84087. While performing field verifications, 3 salt towers in the MDDW Unit were reviewed and verification of the installation of a Pressure Safety Valve (PSV) protecting each salt tower was conducted. Salt Tower VES #30600B was found on Drawing No. 03-PR-PID-0014 (MDDW CSB 1DOC4.3 0156) with no PSV number accompanying the PSV symbol on the drawing. By not maintaining complete and accurate P&ID's, in the event of an emergency, employees can be exposed to serious injury or death should they not be able to locate critical pieces of equipment. This may be a system-wide occurrence that requires evaluation of all piping and instrument diagrams (P&ID's) throughout the facility. Citation History: Inspection #312406986, Issued 7/09/09, Abated 8/11/09, Citation 1, Item 2. P. The employer did not ensure that information pertaining to equipment in the process, specifically piping and instrument diagrams (P&ID's), was complete and accurate. This violation was identified during inspections of the facility from November 2009 to March 2010, Silver Eagle Refining Inc., 2355 South 110 West, Woods Cross, UT, 84087. While performing field verifications, 3 salt towers in the MDDW Unit were reviewed and verification of the installation of a Pressure Safety Valve (PSV) protecting each salt tower was conducted. Salt Tower VES #30600C was found on Drawing No. 03-PR-PID-0015 (MDDW CSB 1DOC4.3 0157) with no PSV number accompanying the PSV symbol on the drawing. By not maintaining complete and accurate P&ID's, in the event of an emergency, employees can be exposed to serious injury or death should they not be able to locate critical pieces of equipment. This may be a system-wide occurrence that requires evaluation of all piping and instrument diagrams (P&ID's) throughout the facility. Citation History: Inspection #312406986, Issued 7/09/09, Abated 8/11/09, Citation 1, Item 2.Q. The employer did not ensure that information pertaining to equipment in the process, specifically piping and instrument diagrams (P&ID's), was complete and accurate. This violation was identified during inspections of the facility from November 2009 to March 2010, Silver Eagle Refining Inc., 2355 South 110 West, Woods Cross, UT, 84087. While performing field verifications, 3 salt towers in the MDDW Unit were reviewed and verification of the installation of a Pressure Safety Valve (PSV) protecting each salt tower was conducted. Salt Tower VES #30600D was found on Drawing No. 03-PR-PID-0015 (MDDW CSB 1DOC4.3 0157) with no PSV number accompanying the PSV symbol on the drawing. By not maintaining complete and accurate P&ID's, in the event of an emergency, employees can be exposed to serious injury or death should they not be able to locate critical pieces of equipment. This may be a system-wide occurrence that requires evaluation of all piping and instrument diagrams (P&ID's) throughout the facility Citation History: Inspection #312406986, Issued 7/09/09, Abated 8/11/09, Citation 1, Item 2. R. The employer did not ensure that information pertaining to equipment in the process, specifically piping and instrument diagrams (P&ID's), was complete and accurate. This violation was identified during inspections of the facility from November 2009 to March 2010, Silver Eagle Refining Inc., 2355 South 110 West, Woods Cross, UT, 84087. While performing field verifications, PSV-39402 in the MDDW Unit was reviewed. This valve was symbolically represented on Drawing No. 03-PR-PID-0005 (MDDW CSB 1DOC4.3 0147). This safety valve could not be located by tag number in the Unit. The safety valve was eventually located by following the piping for the pressure vessel it protected. The valve tag was not stamped PSV-39402. The valve tag was stamped with a different identification system as CRY-PSV-105. By not maintaining complete and accurate P&ID's, in the event of an emergency, employees can be exposed to serious injury or death should they not be able to locate critical pieces of equipment. This may be a system-wide occurrence that requires evaluation of all piping and instrument diagrams (P&ID's) throughout the facility. Citation History: Inspection #312406986, Issued 7/09/09, Abated 8/11/09, Citation 1, Item 2. S. The employer did not ensure that information pertaining to equipment in the process, specifically piping and instrument diagrams (P&ID's), was complete and accurate. This violation was identified during inspections of the facility from November 2009 to March 2010, Silver Eagle Refining Inc., 2355 South 110 West, Woods Cross, UT, 84087. While performing field verifications, PSV-39403 in the MDDW Unit was reviewed. This valve was symbolically represented on Drawing No. 03-PR-PID-0005 (MDDW CSB 1DOC4.3 0147). This safety valve could not be located by tag number in the Unit. The safety valve was eventually located by following the piping for the pressure vessel it protected. The valve tag was not stamped PSV-39403. The valve tag was stamped with a different identification system as CRY-PSV-104. By not maintaining complete and accurate P&ID's, in the event of an emergency, employees can be exposed to serious injury or death should they not be able to locate critical pieces of equipment. This may be a system-wide occurrence that requires evaluation of all piping and instrument diagrams (P&ID's) throughout the facility. Citation History: Inspection #312406986, Issued 7/09/09, Abated 8/11/09, Citation 1, Item 2. T. The employer did not ensure that information pertaining to equipment in the process, specifically piping and instrument diagrams (P&ID's), was complete and accurate. This violation was identified during inspections of the facility from November 2009 to March 2010, Silver Eagle Refining Inc., 2355 South 110 West, Woods Cross, UT, 84087. While performing field verifications, PSV-39405 in the MDDW Unit was reviewed. This valve was symbolically represented on Drawing No. 03-PR-PID-0007 (MDDW CSB 1DOC4.3 0149). This safety valve could not be located by tag number in the Unit. The safety valve was eventually located by following the piping for the pressure vessel it protected. The valve tag was not stamped PSV-39405. By not maintaining complete and accurate P&ID's, in the event of an emergency, employees can be exposed to serious injury or death should they not be able to locate critical pieces of equipment. This may be a system-wide occurrence that requires evaluation of all piping and instrument diagrams (P&ID's) throughout the facility. Citation History: Inspection #312406986, Issued 7/09/09, Abated 8/11/09, Citation 1, Item 2. U. The employer did not ensure that information pertaining to equipment in the process, specifically piping and instrument diagrams (P&ID's), was complete and accurate. This violation was identified during inspections of the facility from November 2009 to March 2010, Silver Eagle Refining Inc., 2355 South 110 West, Woods Cross, UT, 84087. While performing field verifications, PSV-39409 in the MDDW Unit was reviewed. This valve was symbolically represented on Drawing No. 03-PR-PID-0011 (MDDW CSB 1DOC4.3 0153). This safety valve could not be located by tag number in the Unit. The safety valve was eventually located by following the piping for the pressure vessel it protected. The valve tag was not stamped PSV-39409. By not maintaining complete and accurate P&ID's, in the event of an emergency, employees can be exposed to serious injury or death should they not be able to locate critical pieces of equipment. This may be a system-wide occurrence that requires evaluation of all piping and instrument diagrams (P&ID's) throughout the facility. Citation History: Inspection #312406986, Issued 7/09/09, Abated 8/11/09, Citation 1, Item 2. V. The employer did not ensure that information pertaining to equipment in the process, specifically piping and instrument diagrams (P&ID's), was complete and accurate. This violation was identified during inspections of the facility from November 2009 to March 2010, Silver Eagle Refining Inc., 2355 South 110 West, Woods Cross, UT, 84087. While performing field verifications, PSV-39410 in the MDDW Unit was reviewed. This valve was symbolically represented on Drawing No. 03-PR-PID-0011 (MDDW CSB 1DOC4.3 0153). This safety valve could not be located by tag number in the Unit. The safety valve was eventually located by following the piping for the pressure vessel it protected. The valve tag was not stamped PSV-39410. By not maintaining complete and accurate P&ID's, in the event of an emergency, employees can be exposed to serious injury or death should they not be able to locate critical pieces of equipment. This may be a system-wide occurrence thatrequires evaluation of all piping and instrument diagrams (P&ID's) throughout the facility. Citation History: Inspection #312406986, Issued 7/09/09, Abated 8/11/09, Citation 1, Item 2. W. The employer did not ensure that information pertaining to equipment in the process, specifically piping and instrument diagrams (P&ID's), was complete and accurate. This violation was identified during inspections of the facility from November 2009 to March 2010, Silver Eagle Refining Inc., 2355 South 110 West, Woods Cross, UT, 84087. While performing field verifications, PSV-39421 in the MDDW Unit was reviewed. This valve was symbolically represented on Drawing No. 03-PR-PID-0018 (MDDW CSB 1DOC4.3 0160). This safety valve could not be located by tag number in the Unit. The safety valve was eventually located by following the piping for the pressure vessel it protected. The valve tag was not stamped PSV-39421. The valve tag was stamped with a different identification system as CRY-PSV-114. By not maintaining complete and accurate P&ID's, in the event of an emergency, employees can be exposed to serious injury or death should they not be able to locate critical pieces of equipment. This may be a system-wide occurrence that requires evaluation of all piping and instrument diagrams (P&ID's) throughout the facility. Citation History: Inspection #312406986, Issued 7/09/09, Abated 8/11/09, Citation 1, Item 2. X. The employer did not ensure that information pertaining to equipment in the process, specifically piping and instrument diagrams (P&ID's), was complete and accurate. This violation was identified during inspections of the facility from November 2009 to March 2010, Silver Eagle Refining Inc., 2355 South 110 West, Woods Cross, UT, 84087. While performing field verifications, PSV-39420 in the MDDW Unit was reviewed. This valve was symbolically represented on Drawing No. 03-PR-PID-0017 (MDDW CSB 1DOC4.3 0159). This safety valve could not be located by tag number in the Unit. The safety valve was eventually located by following the piping for the pressure vessel it protected. The valve tag was not stamped PSV-39420. The valve tag was stamped with a different identification system as CRY-PSV-115. By not maintaining complete and accurate P&ID's, in the event of an emergency, employees can be exposed to serious injury or death should they not be able to locate critical pieces of equipment. This may be a system-wide occurrence that requires evaluation of all piping and instrument diagrams (P&ID's) throughout the facility. Citation History: Inspection #312406986, Issued 7/09/09, Abated 8/11/09, Citation 1, Item 2.