Standard Cited: 19100119 J05 Process safety management of highly hazardous chemicals.
Inspection Nr: 312412356
Citation: 01013
Citation Type: Serious
Abatement Date: 02/20/2014 X
Initial Penalty: $56,000.00
Current Penalty: $3,000.00
Issuance Date: 04/28/2010
Nr Instances: 30
Nr Exposed: 24
Related Event Code (REC):
Gravity: 10
Report ID: 0854910
Contest Date: 05/27/2010
Final Order: 10/23/2013
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 10/23/2013 | $3,000.00 | 02/20/2014 | Serious | |
Penalty | Z: Issued | 04/28/2010 | $56,000.00 | 06/03/2010 | Willful |
Text For Citation: 01 Item/Group: 013 Hazard: REFINERY
29 CFR 1910.119(j)(5) Equipment deficiencies. The employer shall correct deficiencies in equipment that are outside acceptable limits (defined by the process safety information in paragraph (d) of this section) before further use or in a safe and timely manner when necessary means are taken to assure safe operation. A. The employer did not correct an undercapacity deficiency identified with pressure relief valves in a timely manner. This violation was identified during inspections of the facility from November 2009 to March 2010, Silver Eagle Refining Inc., 2355 South 1100 West, Woods Cross, UT, 84087. As part of the 2007 Silver Eagle Flare Study conducted by VECO, PSV-19406 was identified as being undercapacity for blocked outlet and automatic control failure scenarios (MDDW 1-UOSH-81). On February 15, 2008, Silver Eagle met with VECO to review the results of the recently completed flare study and to discuss corrective actions. The required resolution included replacing the PSV to address the undercapacity issue. Over twenty months lapsed between employer acknowledgement of the deficiency and the November 5, 2009 opening of this inspection, with no progress made on mitigation. By not correcting deficiencies in a timely manner, equipment and the associated relief systems may potentially be compromised and fail. In the event of an equipment failure, employees could be exposed to hazardous situations such as fires, explosions, and/or chemical releases which can result in serious injury or death. This may be a system-wide occurrence that requires evaluation of all pressure relief devices throughout the facility. B. The employer did not correct an undercapacity deficiency identified with pressure relief valves in a timely manner. This violation was identified during inspections of the facility from November 2009 to March 2010, Silver Eagle Refining Inc., 2355 South 1100 West, Woods Cross, UT, 84087. As part of the 2007 Silver Eagle Flare Study conducted by VECO, PSV-29401 is undercapacity for blocked outlet, column reflux failure, overfilling, auto control failure, tube rupture and fire scenarios (MDDW 1-UOSH-81). On February 15, 2008, Silver Eagle met with VECO to review the results of the recently completed flare study and to discuss corrective actions. The required resolution included replacing the PSV to address the undercapacity issue. Over twenty months lapsed between employer acknowledgement of the deficiency and the November 5, 2009 opening of this inspection, with no progress made on mitigation. By not correcting deficiencies in a timely manner, equipment and the associated relief systems may potentially be compromised and fail. In the event of an equipment failure, employees could be exposed to hazardous situations such as fires, explosions, and/or chemical releases which can result in serious injury or death. This may be a system-wide occurrence that requires evaluation of all pressure relief devices throughout the facility. C. The employer did not correct an undercapacity deficiency identified with pressure relief valves in a timely manner. This violation was identified during inspections of the facility from November 2009 to March 2010, Silver Eagle Refining Inc., 2355 South 1100 West, Woods Cross, UT, 84087. As part of the 2007 Silver Eagle Flare Study conducted by VECO, PSV-39403 is undercapacity for blocked outlet failure scenario (MDDW 1-UOSH- 81). On February 15, 2008, Silver Eagle met with VECO to review the results of the recently completed flare study and to discuss corrective actions. The required resolution included replacing the PSV to address the undercapacity issue. Over twenty months lapsedbetween employer acknowledgement of the deficiency and the November 5, 2009 opening of this inspection, with no progress made on mitigation. By not correcting deficiencies in a timely manner, equipment and the associated relief systems may potentially be compromised and fail. In the event of an equipment failure, employees could be exposed to hazardous situations such as fires, explosions, and/or chemical releases which can result in serious injury or death. This may be a system-wide occurrence that requires evaluation of all pressure relief devices throughout the facility. D. The employer did not correct an undercapacity deficiency identified with pressure relief valves in a timely manner. This violation was identified during inspections of the facility from November 2009 to March 2010, Silver Eagle Refining Inc., 2355 South 1100 West, Woods Cross, UT, 84087. As part of the 2007 Silver Eagle Flare Study conducted by VECO, PSV-39409 is undercapacity for loss of cooling scenario (MDDW 1-UOSH-81). On February 15, 2008, Silver Eagle met with VECO to review the results of the recently completed flare study and to discuss corrective actions. The required resolution included replacing the PSV to address the undercapacity issue. Over twenty months lapsed between employer acknowledgement of the deficiency and the November 5, 2009 opening of this inspection, with no progress made on mitigation. By not correcting deficiencies in a timely manner, equipment and the associated relief systems may potentially be compromised and fail. In the event of an equipment failure, employees could be exposed to hazardous situations such as fires, explosions, and/or chemical releases which can result in serious injury or death. This may be a system-wide occurrence that requires evaluation of all pressure relief devices throughout the facility. E. The employer did not correct an undercapacity deficiency identified with pressure relief valves in a timely manner. This violation was identified during inspections of the facility from November 2009 to March 2010, Silver Eagle Refining Inc., 2355 South 1100 West, Woods Cross, UT, 84087. As part of the 2007 Silver Eagle Flare Study conducted by VECO, PSV-39410 is undercapacity for overfilling, auto control failure, and fire scenarios (MDDW 1-UOSH-81). On February 15, 2008, Silver Eagle met with VECO to review the results of the recently completed flare study and to discuss corrective actions. The required resolution included replacing the PSV to address the undercapacity issue. Over twenty months lapsed between employer acknowledgement of the deficiency and the November 5, 2009 opening of this inspection, with no progress made on mitigation. By not correcting deficiencies in a timely manner, equipment and the associated relief systems may potentially be compromised and fail. In the event of an equipment failure, employees could be exposed to hazardous situations such as fires, explosions, and/or chemical releases which can result in serious injury or death. This may be a system-wide occurrence that requires evaluation of all pressure relief devices throughout the facility. F. The employer did not correct an undercapacity deficiency identified with pressure relief valves in a timely manner. This violation was identified during inspections of the facility from November 2009 to March 2010, Silver Eagle Refining Inc., 2355 South 1100 West, Woods Cross, UT, 84087. As part of the 2007 Silver Eagle Flare Study conducted by VECO, PSV-39419 is undercapacity for loss of cooling, overfilling, and auto control failure scenarios (MDDW 1-UOSH-81). On February 15, 2008, Silver Eagle met with VECO toreview the results of the recently completed flare study and to discuss corrective actions. The required resolution included replacing the PSV to address the undercapacity issue. Over twenty months lapsed between employer acknowledgement of the deficiency and the November 5, 2009 opening of this inspection, with no progress made on mitigation. By not correcting deficiencies in a timely manner, equipment and the associated relief systems may potentially be compromised and fail. In the event of an equipment failure, employees could be exposed to hazardous situations such as fires, explosions, and/or chemical releases which can result in serious injury or death. This may be a system-wide occurrence that requires evaluation of all pressure relief devices throughout the facility. G. The employer did not correct an undercapacity deficiency identified with pressure relief valves in a timely manner. This violation was identified during inspections of the facility from November 2009 to March 2010, Silver Eagle Refining Inc., 2355 South 1100 West, Woods Cross, UT, 84087. As part of the 2007 Silver Eagle Flare Study conducted by VECO, PSV-39420 is undercapacity for fire scenario (MDDW 1-UOSH-81). On February 15, 2008, Silver Eagle met with VECO to review the results of the recently completed flare study and to discuss corrective actions. The required resolution included replacing the PSV to address the undercapacity issue. Over twenty months lapsed between employer acknowledgement of the deficiency and the November 5, 2009 opening of this inspection, with no progress made on mitigation. By not correcting deficiencies in a timely manner, equipment and the associated relief systems may potentially be compromised and fail. In the event of an equipment failure, employees could be exposed to hazardous situations such as fires, explosions, and/or chemical releases which can result in serious injury or death. This may be a system-wide occurrence that requires evaluation of all pressure relief devices throughout the facility. H. The employer did not correct an undercapacity deficiency identified with pressure relief valves in a timely manner. This violation was identified during inspections of the facility from November 2009 to March 2010, Silver Eagle Refining Inc., 2355 South 1100 West, Woods Cross, UT, 84087. As part of the 2007 Silver Eagle Flare Study conducted by VECO, PSV-39421 is undercapacity for fire scenario (MDDW 1-UOSH-81). On February 15, 2008, Silver Eagle met with VECO to review the results of the recently completed flare study and to discuss corrective actions. The required resolution included replacing the PSV to address the undercapacity issue. Over twenty months lapsed between employer acknowledgement of the deficiency and the November 5, 2009 opening of this inspection, with no progress made on mitigation. By not correcting deficiencies in a timely manner, equipment and the associated relief systems may potentially be compromised and fail. In the event of an equipment failure, employees could be exposed to hazardous situations such as fires, explosions, and/or chemical releases which can result in serious injury or death. This may be a system-wide occurrence that requires evaluation of all pressure relief devices throughout the facility. I. The employer did not correct an undercapacity deficiency identified with pressure relief valves in a timely manner. This violation was identified during inspections of the facility from November 2009 to March 2010, Silver Eagle Refining Inc., 2355 South 1100 West, Woods Cross, UT, 84087. As part of the 2007 Silver Eagle Flare Study conducted byVECO, PSV-39422 is undercapacity for overfilling and auto control failure scenarios (MDDW 1-UOSH-81). On February 15, 2008, Silver Eagle met with VECO to review the results of the recently completed flare study and to discuss corrective actions. The required resolution included replacing the PSV to address the undercapacity issue. Over twenty months lapsed between employer acknowledgement of the deficiency and the date of this inspection with no progress made on mitigation. By not correcting deficiencies in a timely manner, equipment and the associated relief systems may potentially be compromised and fail. In the event of an equipment failure, employees could be exposed to hazardous situations such as fires, explosions, and/or chemical releases which can result in serious injury or death. This may be a system-wide occurrence that requires evaluation of all pressure relief devices throughout the facility. J. The employer did not correct an undercapacity deficiency identified with pressure relief valves in a timely manner. This violation was identified during inspections of the facility from November 2009 to March 2010, Silver Eagle Refining Inc., 2355 South 1100 West, Woods Cross, UT, 84087. As part of the 2007 Silver Eagle Flare Study conducted by VECO, PSV-59139 is undercapacity for exchanger tube rupture scenario (MDDW 1-UOSH- 81). On February 15, 2008, Silver Eagle met with VECO to review the results of the recently completed flare study and to discuss corrective actions. The required resolution included replacing the PSV to address the undercapacity issue. Over twenty months lapsed between employer acknowledgement of the deficiency and the November 5, 2009 opening of this inspection, with no progress made on mitigation. By not correcting deficiencies in a timely manner, equipment and the associated relief systems may potentially be compromised and fail. In the event of an equipment failure, employees could be exposed to hazardous situations such as fires, explosions, and/or chemical releases which can result in serious injury or death. This may be a system-wide occurrence that requires evaluation of all pressure relief devices throughout the facility. K. The employer did not correct an undercapacity deficiency identified with pressure relief valves in a timely manner. This violation was identified during inspections of the facility from November 2009 to March 2010, Silver Eagle Refining Inc., 2355 South 1100 West, Woods Cross, UT, 84087. As part of the 2007 Silver Eagle Flare Study conducted by VECO, PSV-59233 is undercapacity for fire scenario (MDDW 1-UOSH-81). On February 15, 2008, Silver Eagle met with VECO to review the results of the recently completed flare study and to discuss corrective actions. The required resolution included replacing the PSV to address the undercapacity issue. Over twenty months lapsed between employer acknowledgement of the deficiency and the November 5, 2009 opening of this inspection, with no progress made on mitigation. By not correcting deficiencies in a timely manner, equipment and the associated relief systems may potentially be compromised and fail. In the event of an equipment failure, employees could be exposed to hazardous situations such as fires, explosions, and/or chemical releases which can result in serious injury or death. This may be a system-wide occurrence that requires evaluation of all pressure relief devices throughout the facility. L. The employer did not correct an inlet line pressure drop deficiency in a timely manner. This violation was identified during inspections on site at Silver Eagle Refining Inc., 2355South 1100 West, Woods Cross, UT, 84087 from November 2009 to March 2010. Review of records created as part of the employer's commissioned 2008 VECO Flare Study for PSV- 19406, revealed that over twenty months lapsed between employer acknowledgement of the deficiency and the November 5, 2009 opening of this inspection, with no progress made on mitigation. PSV-19406 was identified on the VECO Flare study as having an ILPD greater than 3 By not correcting equipment deficiencies in a timely manner, equipment can fail exposing employees to hazards which can result in serious injury or death. This may be a system-wide occurrence that requires evaluation of all pressure relieving devices throughout the facility. M. The employer did not correct an inlet line pressure drop deficiency in a timely manner. This violation was identified during inspections on site at Silver Eagle Refining Inc., 2355 South 1100 West, Woods Cross, UT, 84087 from November 2009 to March 2010. Review of records created as part of the employer's commissioned 2008 VECO Flare Study for PSV- 39420, revealed that over twenty months lapsed between employer acknowledgement of the deficiency and the November 5, 2009 opening of this inspection, with no progress made on mitigation. PSV-39420 was identified on the VECO Flare study as having an ILPD greater than 3 By not correcting equipment deficiencies in a timely manner, equipment can fail exposing employees to hazards which can result in serious injury or death. This may be a system-wide occurrence that requires evaluation of all pressure relieving devices throughout the facility. N. The employer did not correct an inlet line pressure drop deficiency in a timely manner. This violation was identified during inspections on site at Silver Eagle Refining Inc., 2355 South 1100 West, Woods Cross, UT, 84087 from November 2009 to March 2010. Review of records created as part of the employer's commissioned 2008 VECO Flare Study for PSV- 19421, revealed that over twenty months lapsed between employer acknowledgement of the deficiency and the November 5, 2009 opening of this inspection, with no progress made on mitigation. PSV-19421 was identified on the VECO Flare study as having an ILPD greater than 3 By not correcting equipment deficiencies in a timely manner, equipment can fail exposing employees to hazards which can result in serious injury or death. This may be a system-wide occurrence that requires evaluation of all pressure relieving devices throughout the facility. O. The employer did not correct an inlet line pressure drop deficiency in a timely manner. This violation was identified during inspections on site at Silver Eagle Refining Inc., 2355 South 1100 West, Woods Cross, UT, 84087 from November 2009 to March 2010. Review of records created as part of the employer's commissioned 2008 VECO Flare Study for PSV- 99410, revealed that over twenty months lapsed between employer acknowledgement of the deficiency and the November 5, 2009 opening of this inspection, with no progress made on mitigation. PSV-99410 was identified on the VECO Flare study as having an ILPD greater than 3 By not correcting equipment deficiencies in a timely manner, equipment can fail exposing employees to hazards which can result in serious injury or death. This may be a system-wide occurrence that requires evaluation of all pressure relieving devices throughout the facility. P. The employer did not correct an inlet line pressure drop deficiency in a timely manner. This violation was identified during inspections on site at Silver Eagle Refining Inc., 2355 South 1100 West, Woods Cross, UT, 84087 from November 2009 to March 2010. Review of records created as part of the employer's commissioned 2008 VECO Flare Study for PSV- 39411, revealed that over twenty months lapsed between employer acknowledgement of the deficiency and the November 5, 2009 opening of this inspection, with no progress made on mitigation. PSV-39411 was identified on the VECO Flare study as having an ILPD greater than 3 By not correcting equipment deficiencies in a timely manner, equipment can fail exposing employees to hazards which can result in serious injury or death. This may be a system-wide occurrence that requires evaluation of all pressure relieving devices throughout the facility. Q. The employer did not ensure that equipment deficiencies were identified and corrected in equipment that is outside acceptable limits before further use or in a safe and timely manner when necessary means are taken to assure safe operation. This violation was identified during inspections on site at Silver Eagle Refining Inc., 2355 South 1100 West, Woods Cross, UT, 84087 from November 2009 to March 2010. UOSH inspection of EXC-10201B revealed the exchanger did not have a relief valve. In addition, Silver Eagle's contractor, Mistras, also identified the deficiency during inspections in January 2010. Documents provided as MDDW-1-UOSH-134 contained notes stating to "Provide and install relief valve." By not correcting equipment deficiencies, employees were exposed to hazards which can result in serious injury or death. This may be a system-wide occurrence that requires evaluation of all pressurized equipment throughout the facility. R. The employer did not ensure that equipment deficiencies were identified and corrected in equipment that is outside acceptable limits before further use or in a safe and timely manner when necessary means are taken to assure safe operation. This violation was identified during inspections on site at Silver Eagle Refining Inc., 2355 South 1100 West, Woods Cross, UT, 84087 from November 2009 to March 2010. UOSH inspection of EXC-10201A revealed the exchanger did not have a relief valve. In addition, Silver Eagle's contractor, Mistras, also identified the deficiency during inspections in January 2010. Documents provided as MDDW-1-UOSH-134 contained notes stating to "install pressure relief valve." By not correcting equipment deficiencies, employees were exposed to hazards which can result in serious injury or death. This may be a system-wide occurrence that requires evaluation of all pressurized equipment throughout the facility. S. The employer did not ensure that equipment deficiencies were identified and corrected in equipment that is outside acceptable limits before further use or in a safe and timely manner when necessary means are taken to assure safe operation. This violation was identified during inspections on site at Silver Eagle Refining Inc., 2355 South 1100 West, Woods Cross, UT, 84087 from November 2009 to March 2010. UOSH inspection of EXC-10203 revealed the exchanger did not have a relief valve. In addition, Silver Eagle's contractor, Mistras, also identified the deficiency during inspections in January 2010. Documents provided as MDDW-1-UOSH-134 contained notes stating to "Provide and install relief valve." By not correcting equipment deficiencies, employees were exposed to hazards which can result in serious injury or death. This may be a system-wide occurrence that requiresevaluation of all pressurized equipment throughout the facility. T. The employer did not ensure that equipment deficiencies were identified and corrected in equipment that is outside acceptable limits before further use or in a safe and timely manner when necessary means are taken to assure safe operation. This violation was identified during inspections on site at Silver Eagle Refining Inc., 2355 South 1100 West, Woods Cross, UT, 84087 from November 2009 to March 2010. UOSH inspection of EXC-10206 revealed the exchanger did not have a relief valve. In addition, Silver Eagle's contractor, Mistras, also identified the deficiency during inspections in December 2009. Documents provided as MDDW-1-UOSH-134 contained notes stating to "install relief valve." By not correcting equipment deficiencies, employees were exposed to hazards which can result in serious injury or death. This may be a system-wide occurrence that requires evaluation of all pressurized equipment throughout the facility. U. The employer did not ensure that equipment deficiencies were identified and corrected in equipment that is outside acceptable limits before further use or in a safe and timely manner when necessary means are taken to assure safe operation. This violation was identified during inspections on site at Silver Eagle Refining Inc., 2355 South 1100 West, Woods Cross, UT, 84087 from November 2009 to March 2010. UOSH inspection of EXC-10204, built in 1963, revealed the exchanger did not have a relief valve. In addition, Silver Eagle's contractor, Mistras, also identified the deficiency during inspections in January 2010. Documents provided as MDDW-1-UOSH-134 contained notes identifying "The exchanger is not equipped with a relief valve." By not correcting equipment deficiencies, employees were exposed to hazards which can result in serious injury or death. This may be a system-wide occurrence that requires evaluation of all pressurized equipment throughout the facility. V. The employer did not ensure that equipment deficiencies were identified and corrected in equipment that is outside acceptable limits before further use or in a safe and timely manner when necessary means are taken to assure safe operation. This violation was identified during inspections on site at Silver Eagle Refining Inc., 2355 South 1100 West, Woods Cross, UT, 84087 from November 2009 to March 2010. UOSH inspection of EXC-10205, built in 1961, revealed the exchanger did not have a relief valve. In addition, Silver Eagle's contractor, Mistras, also identified the deficiency during inspections in January 2010. Documents provided as MDDW-1-UOSH-134 remarked "ASME Section VIII paragraph: UG 125 (no relief)." By not correcting equipment deficiencies, employees were exposed to hazards which can result in serious injury or death. This may be a system-wide occurrence that requires evaluation of all pressurized equipment throughout the facility. W. The employer did not ensure that equipment deficiencies were identified and corrected in equipment that is outside acceptable limits before further use or in a safe and timely manner when necessary means are taken to assure safe operation. This violation was identified during inspections on site at Silver Eagle Refining Inc., 2355 South 1100 West, Woods Cross, UT, 84087 from November 2009 to March 2010. UOSH inspection of EXC-10207, built in 1963, revealed the exchanger did not have a relief valve. In addition, Silver Eagle's contractor, Mistras, also identified the deficiency during inspections in January 2010. Documents provided as MDDW-1-UOSH-134 remarked "ASME Section VIII paragraph: UG125 (no relief)." By not correcting equipment deficiencies, employees were exposed to hazards which can result in serious injury or death. This may be a system-wide occurrence that requires evaluation of all pressurized equipment throughout the facility. X. The employer did not ensure that equipment deficiencies were identified and corrected in equipment that is outside acceptable limits before further use or in a safe and timely manner when necessary means are taken to assure safe operation. This violation was identified during inspections on site at Silver Eagle Refining Inc., 2355 South 1100 West, Woods Cross, UT, 84087 from November 2009 to March 2010. UOSH inspection of EXC-10209A, built in 1964, revealed the exchanger did not have a relief valve. In addition, Silver Eagle's contractor, Mistras, also identified the deficiency during inspections in January 2010. Documents provided as MDDW-1-UOSH-134 contained notes stating "There is no relief valve." By not correcting equipment deficiencies, employees were exposed to hazards which can result in serious injury or death. This may be a system-wide occurrence that requires evaluation of all pressurized equipment throughout the facility. Y. The employer did not ensure that equipment deficiencies were identified and corrected in equipment that is outside acceptable limits before further use or in a safe and timely manner when necessary means are taken to assure safe operation. This violation was identified during inspections on site at Silver Eagle Refining Inc., 2355 South 1100 West, Woods Cross, UT, 84087 from November 2009 to March 2010. UOSH inspection of EXC-10209B, built in 1979, revealed the exchanger did not have a relief valve. In addition, Silver Eagle's contractor, Mistras, also identified the deficiency during inspections in January 2010. Documents provided as MDDW-1-UOSH-134 contained notes stating "no relief valve." By not correcting equipment deficiencies, employees were exposed to hazards which can result in serious injury or death. This may be a system-wide occurrence that requires evaluation of all pressurized equipment throughout the facility. Z. The employer did not ensure that equipment deficiencies were identified and corrected in equipment that is outside acceptable limits before further use or in a safe and timely manner when necessary means are taken to assure safe operation. This violation was identified during inspections on site at Silver Eagle Refining Inc., 2355 South 1100 West, Woods Cross, UT, 84087 from November 2009 to March 2010. UOSH inspection of EXC-10210, built in 1963, revealed the exchanger did not have a relief valve. In addition, Silver Eagle's contractor, Mistras, also identified the deficiency during inspections in January 2010. Documents provided as MDDW-1-UOSH-134 remarked "ASME Section VIII paragraph: UG 125 (no relief)." By not correcting equipment deficiencies, employees were exposed to hazards which can result in serious injury or death. This may be a system-wide occurrence that requires evaluation of all pressurized equipment throughout the facility. AA. The employer did not ensure that equipment deficiencies were identified and corrected in equipment that is outside acceptable limits before further use or in a safe and timely manner when necessary means are taken to assure safe operation. This violation was identified during inspections on site at Silver Eagle Refining Inc., 2355 South 1100 West, Woods Cross, UT, 84087 from November 2009 to March 2010. UOSH inspection of TWR 10136, built in 1943, revealed the vessel did not have a relief valve. In addition, SilverEagle's contractor, Mistras, also identified the deficiency during inspections in December 2009. Documents provided as MDDW-1-UOSH-134 remarked "ASME Section VIII paragraph: UG 125 (no relief)." By not correcting equipment deficiencies, employees were exposed to hazards which can result in serious injury or death. This may be a system-wide occurrence that requires evaluation of all pressurized equipment throughout the facility. BB. The employer did not ensure that equipment deficiencies were identified and corrected in equipment that is outside acceptable limits before further use or in a safe and timely manner when necessary means are taken to assure safe operation. This violation was identified during inspections on site at Silver Eagle Refining Inc., 2355 South 1100 West, Woods Cross, UT, 84087 from November 2009 to March 2010. UOSH inspection of VES 10201, built in 1947, revealed the vessel did not have a relief valve. In addition, Silver Eagle's contractor, Mistras, also identified the deficiency during inspections in December 2009. Documents provided as MDDW-1-UOSH-134 remarked "ASME Section VIII paragraph: UG 125 (no relief)." By not correcting equipment deficiencies, employees were exposed to hazards which can result in serious injury or death. This may be a system-wide occurrence that requires evaluation of all pressurized equipment throughout the facility. CC. The employer did not ensure that equipment deficiencies were identified and corrected in equipment that is outside acceptable limits before further use or in a safe and timely manner when necessary means are taken to assure safe operation. This violation was identified during inspections on site at Silver Eagle Refining Inc., 2355 South 1100 West, Woods Cross, UT, 84087 from November 2009 to March 2010. Inspection of FAN 10214, built in 1977, revealed the fan did not have a relief valve. In addition, Silver Eagle's contractor, Mistras, also identified the deficiency during inspections in January 2010. Documents provided as MDDW-1-UOSH-134 remarked "ASME Section VIII paragraph: UG 125 (no relief)." By not correcting equipment deficiencies, employees were exposed to hazards which can result in serious injury or death. This may be a system-wide occurrence that requires evaluation of all pressurized equipment throughout the facility. DD. The employer did not ensure that equipment deficiencies were identified and corrected in equipment that is outside acceptable limits before further use or in a safe and timely manner when necessary means are taken to assure safe operation. This violation was identified during inspections on site at Silver Eagle Refining Inc., 2355 South 1100 West, Woods Cross, UT, 84087 from November 2009 to March 2010. UOSH inspection of FAN 10215, built in 1995, revealed the fan did not have a relief valve. In addition, Silver Eagle's contractor, Mistras, also identified the deficiency during inspections in December 2009. Documents provided as MDDW-1-UOSH-134 remarked "ASME Section VIII paragraph: UG 125 (no relief)." By not correcting equipment deficiencies, employees were exposed to hazards which can result in serious injury or death. This may be a system-wide occurrence that requires evaluation of all pressurized equipment throughout the facility.