Violation Detail
Standard Cited: 19260652 D01 Requirements for protective systems.
Inspection Nr: 1690080.015
Citation: 01003
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $11,292.00
Current Penalty: $7,904.40
Issuance Date: 02/08/2024
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC):
Gravity: 10
Report ID: 0418100
Contest Date: 03/05/2024
Final Order: 12/20/2024
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 12/20/2024 | $7,904.40 | Serious | ||
Penalty | C: Contested | 03/05/2024 | $11,292.00 | Serious | ||
Penalty | Z: Issued | 02/08/2024 | $11,292.00 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1926.652(d)(1): Materials and equipment used for protective systems were not free from damage or defects that might impair their proper function: a) Excavation located on Massee Ln.: On August 10, 2023, the employer exposed employees to cave-in/engulfment hazards in inside a trench, in that; it failed to provide a trench shield free from damage and defects.