Violation Detail
Standard Cited: 19100147 C04 II D The control of hazardous energy (lockout/tagout).
Inspection Nr: 1686481.015
Citation: 02002
Citation Type: Other
Abatement Date: 04/01/2024 2
Initial Penalty: $16,131.00
Current Penalty: $16,131.00
Issuance Date: 01/26/2024
Nr Instances: 1
Nr Exposed: 6
Related Event Code (REC):
Gravity: 10
Report ID: 0627100
Contest Date:
Final Order: 02/21/2024
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 02/21/2024 | $16,131.00 | 04/01/2024 | Other | |
Penalty | Z: Issued | 01/26/2024 | $16,131.00 | 02/22/2024 | Serious |
Text For Citation: 02 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(4)(ii)(D): The energy control procedures did not clearly and specifically outline the requirements for testing a machine or equipment to determine and verify the effectiveness of lockout devices, tagout devices, and other energy control: On or about July 27, 2023, at the Tire Room- Area B- Channels 1- 8, employees perform repairs and maintenance activities on various equipment such as, but not limited to the DRB tire machines with energy sources such as, but not limited to electrical and pneumatic. The procedures did not include specific steps to verify the effectiveness of the energy control measures.