Violation Detail
Standard Cited: 19100147 D02 The control of hazardous energy (lockout/tagout).
Inspection Nr: 1686481.015
Citation: 01011
Citation Type: Serious
Abatement Date: 02/22/2024 2
Initial Penalty: $16,131.00
Current Penalty: $16,131.00
Issuance Date: 01/26/2024
Nr Instances: 1
Nr Exposed: 6
Related Event Code (REC): R
Gravity: 10
Report ID: 0627100
Contest Date:
Final Order: 02/21/2024
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 02/21/2024 | $16,131.00 | 02/22/2024 | Serious | |
Penalty | Z: Issued | 01/26/2024 | $16,131.00 | 02/22/2024 | Serious |
Text For Citation: 01 Item/Group: 011 Hazard:
29 CFR 1910.147(d)(2): The machine or equipment was not turned off or shut down using the procedures established for the machine or equipment: On or about July 27, 2023, at the Tire Room- Area B- Channels 1- 8, employees perform servicing and maintenance on the DRB #8201 tire machine and components associated to the tire machine, such as but not limited to the unloader and gripper arm, without first deenergizing the machine.