Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 1552263.015
Citation: 02001A
Citation Type: Willful
Abatement Date: 02/28/2024 2
Initial Penalty: $145,027.00
Current Penalty: $217,500.00
Issuance Date: 03/04/2022
Nr Instances: 1
Nr Exposed: 15
Related Event Code (REC):
Gravity: 10
Report ID: 0213900
Contest Date: 03/30/2022
Final Order: 03/15/2024
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 03/15/2024 | $217,500.00 | 02/28/2024 | Willful | |
Penalty | C: Contested | 04/04/2022 | $145,027.00 | 03/30/2022 | Willful | |
Penalty | Z: Issued | 03/04/2022 | $145,027.00 | 03/30/2022 | Willful |
Text For Citation: 02 Item/Group: 001A Hazard:
29 CFR 1910.36(d)(1):Employee(s) were not able to open an exit route door from the inside at all times without keys, tools, or special knowledge: a) Old Tire Building: On or about 9/9/21, an exit door was bolted shut by a metal beam across the doorway preventing employee egress. NOTE: IN ADDITION TO ABATEMENT CERTIFICATION, THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT DOCUMENTATION FOR THIS ITEM. FAILURE TO COMPLY WILL RESULT IN AN ADDITIONAL PENALTY OF $1000.00 IN ACCORDANCE WITH 29 CFR 1903.19.