Standard Cited: 19100303 B01 II General.
Inspection Nr: 1403725.015
Citation: 01009A
Citation Type: Serious
Abatement Date: 10/31/2019 2
Initial Penalty: $7,577.00
Current Penalty: $5,303.90
Issuance Date: 10/04/2019
Nr Instances: 1
Nr Exposed: 9
Related Event Code (REC):
Gravity: 5
Report ID: 0728500
Contest Date:
Final Order: 10/24/2019
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 10/24/2019 | $5,303.90 | 10/31/2019 | Serious | |
Penalty | Z: Issued | 10/04/2019 | $7,577.00 | 10/31/2019 | Serious |
Text For Citation: 01 Item/Group: 009A Hazard:
29 CFR 1910.303(b)(1)(ii): Electrical equipment was not free from recognized hazards, based on the mechanical strength and durability, including, for parts designed to enclose and protect other equipment, the adequacy of the protection thus provided: (a) Employees were exposed to electrical hazards. The Johnson 60 Punch Press, Asset # F374, had a two hand control that had a missing knockout. (b) Employees in the Mold Maintenance Department were exposed to electrical hazards. The Siemens 240 electrical breaker next to the lathe had two open knockouts on the left side.