Violation Detail
Standard Cited: 19100305 G01 IV A Wiring methods, components, and equipment for general use.
Inspection Nr: 1401254.015
Citation: 01012A
Citation Type: Serious
Abatement Date: 12/13/2019 2
Initial Penalty: $3,978.00
Current Penalty: $2,000.00
Issuance Date: 11/08/2019
Nr Instances: 2
Nr Exposed: 9
Related Event Code (REC):
Gravity: 1
Report ID: 0936400
Contest Date:
Final Order: 12/26/2019
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 12/26/2019 | $2,000.00 | 12/13/2019 | Serious | |
Penalty | Z: Issued | 11/08/2019 | $3,978.00 | 12/13/2019 | Serious |
Text For Citation: 01 Item/Group: 012A Hazard:
29 CFR 1910.305(g)(1)(iv)(A): Flexible cords and/or cables were used as a substitute for the fixed wiring of a structure: a) B Building- Employees were exposed to fire hazards from an extension cord used to power security cameras and other permanent equipment. b) B Building- Employees were exposed to fire hazards from an extension cord used to power permanent equipment like the Dayton Crane.