Violation Detail
Standard Cited: 19100119 J04 I Process safety management of highly hazardous chemicals.
This violation item has been deleted.
Inspection Nr: 1281449.015
Citation: 01007B
Citation Type: Serious
Abatement Date: 07/02/2018 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 05/11/2018
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC):
Gravity: 10
Report ID: 0627100
Contest Date: 06/04/2018
Final Order: 03/06/2019
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 03/06/2019 | $0.00 | 07/02/2018 | Serious | |
Penalty | C: Contested | 06/06/2018 | $0.00 | 07/02/2018 | Serious | |
Penalty | Z: Issued | 05/11/2018 | $0.00 | 07/02/2018 | Serious |
Text For Citation: 01 Item/Group: 007B Hazard:
29 CFR 1910.119(j)(4)(i): Inspections and tests were not performed on process equipment. This violation was most recently observed on about December 6, 2017 in the Benzoyl Peroxide (BPO) Unit at United Initiators located in Helena, Arkansas Texas when the employer did not perform inspections and test on process equipment; including but not limited to; a) Reactor Vent Scrubber S-1101 b) 70% Hydrogen Peroxide Day Tank T-1112 c) Mother Liquor Heat Exchanger #1 d) Benzoyl Chloride Bulk Storage Tank T-1103 e) Pressure Safety Relief Valves #408, #410 and #413 f) 12" BzCl-XX-0701, 2" BzCl-XX-0404, and 1/2" H2O2-XX-0405 process piping.