Violation Detail
Standard Cited: 19100119 J02 Process safety management of highly hazardous chemicals.
Inspection Nr: 1226822.015
Citation: 01005
Citation Type: Serious
Abatement Date: 12/07/2017 2
Initial Penalty: $12,675.00
Current Penalty: $6,000.00
Issuance Date: 10/17/2017
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC):
Gravity: 10
Report ID: 0627100
Contest Date:
Final Order: 11/15/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 11/15/2017 | $6,000.00 | 12/07/2017 | Serious | |
Penalty | Z: Issued | 10/17/2017 | $12,675.00 | 12/07/2017 | Serious |
Text For Citation: 01 Item/Group: 005 Hazard:
29 CFR 1910.119(j)(2): Written procedures. The employer shall establish and implement written procedures to maintain the on-going integrity of process equipment. The employer did not develop and/or implement a mechanical integrity procedure to reinstate the vapor seal of piping such as the CD piping for the Recirculator Oil Pot and the insulation on Valve 196 on the engine room roof which were found to be deteriorated.