Violation Detail
Standard Cited: 19100184 E03 I Slings.
Inspection Nr: 1208998.015
Citation: 01002B
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 05/11/2017
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity: 1
Report ID: 0112000
Contest Date:
Final Order: 06/01/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/01/2017 | $0.00 | Serious | ||
Penalty | Z: Issued | 05/11/2017 | $0.00 | Serious |
Text For Citation: 01 Item/Group: 002B Hazard:
29 CFR 1910.184(e)(3)(i): A thorough periodic inspection of alloy steel chain slings was not made on a regular basis and/or were done at intervals greater than once every 12 months: 11 Cody Street, Booth 5: On, or about, February 8, 2017, a three legged lifting sling that contained chain alloy components had not been provided with periodic, documented inspections.