Violation Detail
Standard Cited: 19100184 E03 I Slings.
Inspection Nr: 1160674.015
Citation: 01001D
Citation Type: Serious
Abatement Date: 02/27/2017 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 09/07/2016
Nr Instances: 1
Nr Exposed: 5
Related Event Code (REC):
Gravity: 5
Report ID: 0112000
Contest Date: 10/13/2016
Final Order: 03/17/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 03/17/2017 | $0.00 | 02/27/2017 | Serious | |
Penalty | C: Contested | 10/13/2016 | $0.00 | 10/25/2016 | Serious | |
Penalty | Z: Issued | 09/07/2016 | $0.00 | 10/25/2016 | Serious |
Text For Citation: 01 Item/Group: 001D Hazard:
29 CFR 1910.184(e)(3)(i): A thorough periodic inspection of alloy steel chain slings was not made at least every 12 months: Q2, Reclaim Platform: On, or about, July 1, 2016, a single leg sling that was used to suspend the reclaim bag lifting frame was not subject to periodic, documented inspections.