Violation Detail
Standard Cited: 19100119 D03 I B Process safety management of highly hazardous chemicals.
Inspection Nr: 1089035.015
Citation: 02001
Citation Type: Other
Abatement Date: 01/15/2016 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 11/27/2015
Nr Instances: 4
Nr Exposed: 4
Related Event Code (REC):
Gravity:
Report ID: 0524500
Contest Date:
Final Order: 12/15/2015
Emphasis:
Substance: 0170
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 12/15/2015 | $0.00 | 01/15/2016 | Other | |
Penalty | Z: Issued | 11/27/2015 | $0.00 | 01/15/2016 | Other |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1910.119(d)(3)(i)(B): The employer's piping and instrument diagrams were not accurate and did not represent equipment that was existing and was part of the process: The employer did not ensure the piping and instrumentation diagrams were current and accurate: a. On P&ID 701, there were two valves that were listed that were not in the field; LTP1/HV11 and LTP2/HV11. b. On P&ID 702, there were two valves that were listed that were not in the field; MTP1/HV11 and MTP2/HV11.