Violation Detail
Standard Cited: 19260451 F03 General requirements.
Inspection Nr: 1077979.015
Citation: 02001
Citation Type: Other
Abatement Date: 12/28/2015 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 12/08/2015
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity:
Report ID: 0316700
Contest Date:
Final Order: 12/23/2015
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 12/23/2015 | $0.00 | 12/28/2015 | Other | |
Penalty | Z: Issued | 12/08/2015 | $0.00 | 12/28/2015 | Other |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1926.451(f)(3): Scaffolds and scaffold components were not inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity: a) West Weaver Covered Bridge / Conococheague Creek area; Employees were working on steel tubular scaffolding while installing stabilizers and x bracing on the wooden covered bridge without the competent person having performed a structural integrity inspection of the scaffolding before each work shift, on or about 07/16/2015. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.