Violation Detail
Standard Cited: 19100303 B02 General.
Inspection Nr: 1702534.015
Citation: 04004
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 04/10/2024
Nr Instances: 1
Nr Exposed: 15
Abatement Date: 11/01/2024
Gravity:
Report ID: 0316700
Contest Date:
Final Order: 05/02/2024
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 05/02/2024 | $0.00 | 11/01/2024 | Other | |
Penalty | Z: Issued | 04/10/2024 | $0.00 | 04/29/2024 | Other |
Text For Citation: 04 Item/Group: 004 Hazard:
29 CFR 1910.303(b)(2): Listed or labeled electrical equipment was not used or installed in accordance with instructions included in the listing or labeling: (a) 3008 Penns Valley Road, Centre Hall, PA; Entre Room - On or about October 27, 2023, the employer used daisy chained extension cords to power the scale, slurry mixer(s), and roller conveyor motor in violation of listing and labeling. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.