Violation Detail
Standard Cited: 19100036 B04 Design and construction requirements for exit routes.
Inspection Nr: 10020576
Citation: 03009
Citation Type: Other
Abatement Status: X
Initial Penalty: $100.00
Current Penalty: $50.00
Issuance Date: 04/16/1979
Nr Instances: 2
Nr Exposed:
Abatement Date: 05/07/1979
Gravity:
Report ID: 0111400
Contest Date: 11/15/1980
Final Order:
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Z: Issued | 04/16/1979 | $100.00 | 05/07/1979 | Other | |
| Penalty | F: Formal Settlement | 04/15/1979 | $50.00 | 05/07/1979 | Other |
Translate