Violation Detail
Standard Cited: 19100303 G01 I C General.
Inspection Nr: 1091666.015
Citation: 03006C
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 02/17/2016
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 06/30/2016
Gravity: 5
Report ID: 0112000
Contest Date:
Final Order: 03/14/2016
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/14/2016 | $0.00 | 06/30/2016 | Serious | |
Penalty | Z: Issued | 02/17/2016 | $0.00 | 04/04/2016 | Serious |
Text For Citation: 03 Item/Group: 006C Hazard:
29 CFR 1910.303(g)(1)(i)(C): The work space was not clear and did not extend from the grade, floor, or platform to the height required by paragraph (g)(1)(vi) of this section. Other equipment associated with the electrical installation and located above or below the electric equipment extended more than 153 mm (6 in.) beyond the front of the electric equipment: Heat Treat: On, or about, September 21, 2015, Panel #13, a Challenger 208 panelboard was not provided with adequate working space in that a Precision transformer had been installed on the floor in front of the panelboard.