Violation Detail
Standard Cited: 19100305 B01 II Wiring methods, components, and equipment for general use.
Inspection Nr: 1566871.015
Citation: 03006
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $9,063.00
Issuance Date: 06/02/2022
Nr Instances: 2
Nr Exposed: 15
Abatement Date: 01/03/2023
Gravity:
Report ID: 0316700
Contest Date:
Final Order: 06/21/2022
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/21/2022 | $9,063.00 | 01/03/2023 | Other | |
Penalty | Z: Issued | 06/02/2022 | $0.00 | 06/14/2022 | Other |
Text For Citation: 03 Item/Group: 006 Hazard:
29 CFR 1910.305(b)(1)(ii):Unused openings in boxes, cabinets, or fittings were not effectively closed: a. Building 1 Bailer - On or about February 2, 2022, the power box for the Quincy Compressor had an unused opening on the bailer side, exposing employees to an electrical hazard. b. Building 1 Bailer - On or about February 2, 2022, the power box for the Quincy Star ATV5-80 had an unused opening on the bailer side, exposing employees to an electrical hazard. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.