Violation Detail
Standard Cited: 19100305 G01 IV A Wiring methods, components, and equipment for general use.
Inspection Nr: 924666.015
Citation: 03004
Citation Type: Other
Abatement Date: 03/03/2014 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 01/28/2014
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity:
Report ID: 0418100
Contest Date:
Final Order: 02/20/2014
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 02/20/2014 | $0.00 | 03/03/2014 | Other | |
Penalty | Z: Issued | 01/28/2014 | $0.00 | 03/03/2014 | Other |
Text For Citation: 03 Item/Group: 004 Hazard:
29 CFR 1910.305(g)(1)(iv)(A): Flexible cords and/or cables were used as a substitute for the fixed wiring of a structure: a) Plant, Airlay #3 - On or about 07/29/13 the flexible cable carrying power from the regrinder switch box to the air blower switch box was left unprotected and was not mounted inside a conduit. Employees were exposed to potential loss of insulation and contact with live parts. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET.