Violation Detail
Standard Cited: 19100303 G02 I General.
Inspection Nr: 900519.015
Citation: 03003
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 10/09/2013
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 10/22/2013
Gravity:
Report ID: 0316100
Contest Date:
Final Order: 10/28/2013
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 10/28/2013 | $0.00 | 10/22/2013 | Other | |
| Penalty | Z: Issued | 10/09/2013 | $0.00 | 10/22/2013 | Other |
Text For Citation: 03 Item/Group: 003 Hazard:
29 CFR 1910.303(g)(2)(i): Live parts of electric equipment operating at 50 volts or more were not guarded against accidental contact by use of approved cabinets or other forms of approved enclosures : a) Warehouse - Employees were exposed to a forklift battery charger with a damaged access door exposing employees to an electrical hazard in the warehouse, on or about 04/10/13. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Translate