Violation Detail
Standard Cited: 19100305 A02 I B Wiring methods, components, and equipment for general use.
Inspection Nr: 1066299.015
Citation: 03003
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 11/18/2015
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 12/08/2015
Gravity:
Report ID: 0317300
Contest Date:
Final Order: 12/11/2015
Related Event Code (REC): A
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 12/11/2015 | $0.00 | 12/08/2015 | Other | |
Penalty | Z: Issued | 11/18/2015 | $0.00 | 12/08/2015 | Other |
Text For Citation: 03 Item/Group: 003 Hazard:
29 CFR 1910.305(a)(2)(i)(B): Temporary wiring was used for a period exceeding 90 days. a) 24483 Sussex Highway, Seaford, DE, block ice machine - On or about May 28, 2015 the employer did not install permanent wiring where needed, but used a flexible cord for a period of 2 years, exposing the employees to a shock hazard.