Violation Detail
Standard Cited: 19100037 A03 Maintenance, safeguards, and operational features for exit routes.
Inspection Nr: 1640143.015
Citation: 03002B
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $7,366.00
Current Penalty: $7,366.00
Issuance Date: 06/15/2023
Nr Instances: 2
Nr Exposed: 40
Abatement Date: 09/01/2023
Gravity: 1
Report ID: 0316700
Contest Date:
Final Order: 07/11/2023
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 07/11/2023 | $7,366.00 | 09/01/2023 | Other | |
Penalty | Z: Issued | 06/15/2023 | $7,366.00 | 06/30/2023 | Serious |
Text For Citation: 03 Item/Group: 002B Hazard:
29 CFR 1910.37(a)(3): Exit route(s) were not kept free and unobstructed: a. Man Door 23 - On or about December 20, 2022, there was a fence and key controlled gate that prevented access to man door 23 which was identified as an emergency exit, employees were exposed to fire egress hazards. b. Maintenance - On or about December 20, 2022, exit door A4 was blocked by a dumpster, floor sweep roll and various other maintenance tools, employees were exposed to fire egress hazards. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.